俄罗斯国产精品Av_国产天堂网免费_在线观看中文字幕欧美_日本色色色w ww_伊人色域影视五月情在线观看_亚洲欧洲操逼视频_乳头无码优质视频_99r这里只有精品91麻豆_嫩模私拍在线播放_久操手机_深夜老司机福利一区_咸阳毛片_久久久区九_欧美成人大香蕉1532区_青草草国产免费大片

products 產(chǎn)品列表

 YP Series (Pressure Type) Hydraulic Dynamometer
 Hits:32921 AddTime:2024/2/4 9:27:21

一、Summary

YP series (pressure type) hydraulic dynamometers have been widely used abroad in the 1960s and 1970s. In 1985, through license trade, China introduced the technology of Zoller Company, West Germany, to develop and produce this type of advanced dynamometer. At present, the process technology has been used in the production of a whole series of products in China. Internationally, there are Fraud in England and Cairn Company in the United States. In addition, two domestic companies have produced this series of products in small batches through imitation. Our company digests and absorbs foreign technology, carries out new optimization design and production, and can provide a full range of products.

YP series hydraulic dynamometer has 12 specifications, all of which are controlled by electric drainage butterfly valve. That is, by changing the opening of butterfly valve to change the size of absorption power. The braking power range is from 20KW to 5900KW, and the variety is complete. Domestic and foreign users choose the right type according to their engine power range.
This product is mainly used to test the effective power of various diesel engines, gasoline engines, motors and other power engines. It is an indispensable test equipment in the performance test of power engine and the efficiency test of transmission machinery.
The basic model of this product is one-way test. If users need to order with two-way test at the same time, please make a request and our company will give special customization.

二、Technical specifications

1.Main features
◆Small size, easy installation;
◆Simple structure, easy operation and maintenance;
◆High braking moment;
◆High accuracy of measurement;
◆Work stably and reliably;
◆Achieving High Precision Instantaneous Speed Measurement with Magnetoelectric Velocity Sensor;
◆Fast Load Control of Electronically Controlled Butterfly Valve;
◆Fast response, suitable for dynamic test

2.Measuring performance indicators

Project sensor type Measuring range Accuracy Remarks
Rotating speed ZSB magnetoelectric speed sensor 300-7500r/min ±1r/min
Greater than 7500r/min
When the speed wheel and control components are treated separately.
Torque Strain gauge tension sensor Match the dynamometer range ±0.2% FS
Water valve position
Precision potentiometer
(DPF, YZ60 Watergate Actuator)
0-100% 0.2% FS
Throttle position
Precision potentiometer
(YZ60, YZ60A throttle actuator)
0-100% 0.2% FS

3.Technical parameter


Hydraulic dynamometer model
YP60 YP120 YP250 YP380 YP520 YP660 YP880 YP1200 YP1900 YP2500 YP3300
Maximum absorption rate (KW) 60 120 250 380 520 660 880 1200 1900 2500 3300
Torque measurement accuracy (FS) ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2%
Speed ​​measurement accuracy (FS) ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰
Spindle rotation direction unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional
Brake force measurement range (N) 0~180 0~550 0~1000 0~1300 0~2500 0~3300 0~6000 0~12000 0~18000 0~27000 0~35000
Maximum braking torque (Nm) 172 525 980 1240 2450 3150 5700 11760 17200 26460 33400
Maximum water consumption (Kg/h) 1200 2400 5000 8000 10400 13900 18500 24000 36300 50000 66000
Drainage maximum temperature (°C) 70 70 70 70 70 70 70 70 70 70 70
Total length of the spindle 448 510 500 500 600 600 802

1296

1296 1440 1440
Spindle cone length and taper 63, 1:30 70, 1:30 70, 1:30 70, 1:30 70, 1:30 80, 1:30 100, 1:30 192, 1:30 192, 1:30 170, 1:30 170, 1:30
The center of the spindle is high to the bottom of the base 255

300

300 300 350 350 650 760 760 840 840
Dynamometer dimensions (length × width × height) 450×400×370 655×530×430 640×536×460 640×536×460 760×620×543 760×620×543 1078×845×905 1598×.51310×1135 1598×.51310×1135 1452×1558×1310 145×21558×1330
Base size (length × width × height) 640×400×90 640×394×110 640×400×100 640×400×100 760×490×120 760×490×120 1060×820×310 1476×1200×260 1476×1200×260 1256×1559×260 1256×1559×260
Foot screw hole position 590×340 600×335 580×330 580×330 700×420 700×420 990×650 1350×1074 1350×1074 1421×1116 1420×1116 
(×690)
Dynamometer net weight (Kg) 170 180 200 200 410 435 950 2800 2900 3200 3300
Maximum spindle speed (r/min) 9000 7500 7500 5000 5000 3500 3000 3000 3000 3000 3000
Moment of inertia 
(Kg.M2)
0.012 0.041 0.065 0.074 0.480 0.511 0.721 3.6 4 6.8 7.1

Table units:mm

4. characteristic curve

The application scope of hydraulic dynamometer can b e seen from its characteristic curve as shown in Fig. 1 (a), (b), (c), (d), (e), (f), (g), (h). Characteristic curve shows the power range that dynamometer can absorb at different rotational speeds.
The OA curve represents the maximum power line that the dynamometer can absorb with the change of rotational speed under a certain inlet pressure.
When AB line keeps the dynamometer's maximum torque, the maximum power line that dynamometer can absorb will change with the speed.
When the AC line (YP20) and BC line are not more than the maximum permissible discharge temperature of dynamometer, the maximum power limit line that dynamometer can absorb.
CD line is the maximum speed limit line of dynamometer.
OD curve is the braking power line (air friction resistance) of Dynamometer when it is not filled with water.
The area surrounded by the curve graph OABCDO indicates the power range that the hydraulic dynamometer can absorb. This is also the basis for choosing dynamometer in power machine performance test. In general, all the characteristics of the power machine can be tested on this type of hydraulic dynamometer within the range of curve and figure.
﹡When choosing dynamometer, users must pay attention to whether the test point of the dynamometer is within the range of the characteristic curve of the dynamometer and avoid the edge of the curve as far as possible.
﹡The minimum absorptive power line (full open position of butterfly valve) is slightly higher than OD line under the optimal control of water filling, and should not be too close to OD line when selecting type.

三、Structure of dynamometer

YP type hydraulic dynamometer is mainly composed of body parts, force measuring mechanism parts, intake and drainage parts, correction parts, electric drainage valve parts, automatic regulating device parts and lubricating parts. See Figures II (a), (b).
1.Body parts
The body parts are the main parts of dynamometer to absorb the effective torque of power machine by using water. See Figures III (a), (b).
The mechanical energy output from the power machine is converted into heat energy here, which is absorbed by the water entering the shell and discharged. A very small part of the mechanical energy is dissipated to the air by the wall of the dynamometer shell.
The simple structure consists of a swinging housing mounted on a rolling bearing and a rotor mounted on a spindle. The dynamometer rotor is installed in the middle of the main shaft, and the left and right side shell and the left and right bearing shell are symmetrically installed on both sides of the rotor. The working cavity is formed by the rotor pit and the left and right side shell pit. The bimetallic bushing connected with the shell of the left and right bearing not only acts as the bushing, but also acts as the sealing water. YP880, Y1200, YP1900, YP2500, YP3300 and YP5900 dynamometers are sealed by clearance to prevent water from entering the bearing, thus ensuring the service life of the bearing.
There are drainage holes on the shell and water intake holes on the left and right bearing shell to ensure the entry of low-temperature water and the discharge of high-temperature water. There is an overflow pipe in both the left and right bearing housing, and the water thrown out by the water throwing ring is discharged after the overflow pipe enters the base.
The spindle is equipped with coupling at both ends of the cone, and the speed measuring gear is installed on one side. Through the speed measuring sensor, the spindle speed can be displayed in the digital display table.


Figure two(bY880-S、Y1900-SY3300-SOutline schematic diagram of hydraulic dynamometer

1、Body parts2、Dynamometer unit 3、Lubrication parts 4、Intake and drainage components5、correcting member6、Automatic adjusting device components

Figure three(a)YP1900Structural sketch of airframe components

1、base  2、Left and Right Bearing Seats  3、Spindle components  4、Coupling  5、Bearing plate  6. Skeleton oil seal 7, axle sleeve 8.9, bimetal axle sleeve & nbsp; 10, left and right bearing shell & nbsp; 11, left and right side shell & nbsp; 12, screw & nbsp; 13, rotor 14, shell & nbsp; 15, water seal ring & nbsp; 16, speed measuring gear & nbsp; 17, speed sensor & nbsp; 18, overflow pipe & nbsp; 19, cock

Figure three(b)YP1900Structural sketch of airframe components

1、base 2. Bearing seat 3, coupling 4, spindle component 5, bearing shell 6, shell 7, side shell 8, rotor 9, speed sensor 10, speed measuring gear


2.Force measuring mechanism components
The components of force measuring mechanism are used to measure braking force, as shown in Fig. 4 (a), (b).

It is mainly composed of brake arm, tension pressure sensor and movable bolt. The braking moment produced by the body parts is balanced with the reaction moment of the brake arm pull-up pressure sensor, and the braking force is displayed by an electronic digital display instrument. In order to protect the sensor, nylon ring or rubber ring is installed at one end of the movable plate bolt to play a buffer role. At the same time, in order to prevent the sensor from being damaged by vibration in transportation, a supporting and fixing protection device is provided. The bolt of the fixed sensor must be loosened in use, and the movable plate should be pulled to one side. If there is no movable plate, the bolt can be screwed off.


Figure four(a)YP20、YP60、YP120、YP250YP380、YP520、YP660

Drawing of Force Measuring Mechanism Components

1. Brake arm 2, tension and pressure sensor 3, movable bolt 4, support 5, protective cover 6, movable plate 7, bolt 4


Figure four(b)YP1900Schematic diagram of dynamometer mechanism

1. Brake arm 2, fixed bolt 3, movable bolt 4, tension pressure sensor


3、Intake and drainage components
The intake and drainage components are composed of intake components and drainage components. It is mainly used for entering low temperature water and discharging high temperature water when dynamometer works. See Fig. 5 (a), (b).
YP60, YP120, YP250, YP380, YP520 and YP660 hydraulic dynamometers are composed of brackets, pipes and elbows. The elbows are connected with the left and right bearing housing of the body parts to form the intake pipeline of the dynamometer.
The drainage components are composed of brackets, pipes and elbows. The elbow is connected with the outer shell to form a drainage pipeline of dynamometer. The water thrown out by the water throwing ring in the body parts is discharged after the overflow pipe enters the base.

The intake parts of YP880, YP1200, YP1900, YP2500, YP3300 and YP5900 dynamometers are composed of intake valve parts and intake pipes. The drainage components are composed of a drainage butterfly valve, a drainage elbow and a drainage actuator.


Figure five(a)Drawing of Intake and Drainage Components

1. Overflow pipe 2, permeable pipe 3, intake parts (5, elbow 6, pipeline 7, bracket) 4, drainage parts (8, bracket 9, pipeline 10, elbow)

Figure five(b)Y880-S、Y1900-SY3300-SDrawing of Intake and Drainage Components

1. Spillway 2, Intake Component 3, Drainage Actuator 4, Drainage Butterfly Valve 5, Drainage Bend

4、  Calibration Component (Static Calibration Component)
Calibration components are used for static calibration of dynamometers, as shown in Fig. 6.
It is mainly composed of calibration arm, lifting parts, suspenders, trays and weights.
The distance L from the center of dynamometer spindle to the triangular knife edge of static calibration arm and the total weight W are shown in the table below.
L and W values


Model Arm lengthL(mm)±0.125 Weight total weightW(kg)
YP60 973.8 18
YP120 973.8 55
YP250 468.9 200
YP380 486.9 260
YP520 973.8 250
YP660 973.8 330
YP880 973.8 600
YP1200 1947.5±0.30 600
YP1900 1947.5±0.30 900
YP2500 1947.5±0.30 1350
YP3300 1947.5±0.30 1750

Fig. 6. Schematic diagram of correction components
1. Correction arm 2, lifting parts 3, lifting rod 4, tray 5, weights

5. & nbsp; Electric Drainage Valve Components
DPF electric drain valve components are used to automatically control the opening position of the drain valve, adjust the pressure of the dynamometer chamber, so that the thickness of the water ring changes with the change of working conditions, that is, to change the absorption load, as shown in figure 7.
It is mainly composed of shell, moment motor, planetary gear pair, butterfly valve, potentiometer and so on. Matching with the electronic control cabinet, the opening of the valve can be controlled by the compartment.

YP60、YP120、YP250、YP380、YP520、YP660 Hydraulic dynamometers use this form to control the drainage butterfly valve



Figure sevenDiagram of DPF Electric Drainage Valve Components

1. Potentiometer 2, Torque Motor 3, Planetary Pair 4, Shell 5, Butterfly Valve

6、   Automatic adjusting device components
The components of the automatic regulating device control the opening position of the valve slice of the drainage butterfly valve through the drainage actuator, and adjust the pressure of the inner chamber of the dynamometer to change the load, as shown in figure 8.

Fig. 8. Component sketch of automatic regulating device
1. Drainage Actuator 2.3, Gear Pair (Synchronized Tooth Belt) 4, Angle Iron 5, Drainage Butterfly Valve 6, Support Plate

It is mainly composed of drainage actuator, drainage butterfly valve, supporting plate, gear pair, etc.

YP880, YP1200, YP1900, YP2500, YP3300, YP5900 hydraulic dynamometers all use this form to control the drainage butterfly valve.

YP880, YP1200, YP1900 dynamometers are equipped with YZ60A drainage actuator produced by our factory, YP2500, YP3300, YP5900 dynamometers are equipped with YZ20 drainage actuator.


7、Lubrication parts
Lubrication parts are mainly used for rolling bearing lubrication of dynamometer.
YP60, YP120, YP250, YP380, YP520 and YP660 hydraulic dynamometers are all lubricated with grease, and their locations are shown in Fig. 2 (a). ZL45-2 lithium-based grease can be directly injected into the pressure oiler (tanker). The specific requirements are shown in Schedule 4.
The lubrication components of YP880, YP1200, YP1900, YP2500, YP3300 and YP5900 hydraulic dynamometers are shown in Figure 2 (b). Oil mist lubrication, drip oil lubrication and pump oil lubrication can be used respectively according to user's requirements and different working conditions.

(1)Oil mist lubrication

Oil mist lubrication can be used when dynamometer works at medium and high speed. Oil mist lubrication is mainly composed of gas source, pressure reducing valve, oil mist, gas pipe and so on. V-01/10 compressor can be used as gas source for a single dynamometer. Before starting the dynamometer, it is necessary to ensure the normal operation of the oil mist system. Oil mist lubrication is detailed in the instructions for the use of oil mist lubrication devices.

(2)Drip lubrication When the dynamometer works at a low speed, it can adopt drip oil lubrication instead of oil mist lubrication or pump oil lubrication.

If the working speed of YP1900 hydraulic dynamometer is below 2200 r/min, and YP3300 hydraulic dynamometer is below 1800 r/min, oil drop lubrication can be used.

(3)Pump oil lubrication

When the dynamometer works at a high speed, in order not to make the bearing temperature rise too high, the pump oil lubrication can be used.

Pump oil lubrication is mainly composed of pumping station and inlet and outlet oil system. Pump oil lubrication must start the pump station to lubricate the bearing of dynamometer before starting the dynamometer main engine and adding water for testing. Pump

oil inlet pressure can be adjusted by LI-10 throttle valve, and the pressure can be controlled in the range of 0.01-0.05 Mpa. It is suggested that as long as the working conditions are satisfied, the pressure should be as low as possible to reduce leakage.

四、Working Principle and Power Calculation of Dynamometer

1、 Working principle

The power machine drives the rotor components on the dynamometer spindle to rotate synchronously through the coupling, which stirs the water in the working chamber. Because of the centrifugal force produced by rotor rotation and the effect of rotor pits, water produces strong water eddy current between the side shell and the rotor pit. It gives the shell a rotating moment, so that the torque of the power machine is transmitted from the rotor to the shell. The brake arm mounted on the shell will rotate at an angle, so that the brake force is transmitted to the tension pressure sensor connected with the brake arm through the electronic digital display device. Display the braking force.

The dynamometer controls the opening of butterfly valve by electric drainage valve or drainage actuator by automatic regulating device. The opening of butterfly valve is controlled by drainage actuator to change the pressure of water in the working chamber of dynamometer to change the absorption power. At the same time, the speed of dynamometer can be measured by the speed sensor and displayed on the electronic display instrument.

Because it is a pressure-controlled hydraulic dynamometer and adjusts the pressure of working chamber by changing the opening of butterfly valve, the whole process must be an automatic closed-loop control system, so the pressure YP dynamometer must be equipped with an electronic control cabinet with automatic control function to operate.

2、 Calculation
(1)Power calculation
The effective power of dynamometer can be calculated by the following simple formulas when the length of statically calibrated arm is 973.8mm, guaranteed by the structure design.:
P= F n/ 10000 (Kilowatt)
Type: F--- loading (Newton)
N - Speed (Rotation/Point)
(2)Torque calculation
M=F.L (N.M)
Type:F---load(Newton)

L---Calculated arm length is 0.9549(m)

五、Water supply system of dynamometer
The water supply of dynamometer can be used in circulating water supply system. The water supply is provided by high pressure stabilizing water tank or low pressure stabilizing water tank plus pipeline pump. Generally, the indoor water tank in the north is composed of a low-level stabilized water tank and a pipeline pump (see figure 8).
The intake pressure of dynamometer can be greater than or equal to 0.05 MPa, usually 0.05-0.15 MPa. When the dynamometer works on the full water line, it requires higher water supply pressure; when it works below the full water line, the water pressure can be lower. The water supply pressure should be kept stable, and the range of pressure fluctuation should be (+5KPa). When the dynamometer works, the water supply pressure directly affects the cavitation degree of the side shell of the dynamometer and the concave working chamber of the rotor.
In the process of dynamometer operation, water intake can not be interrupted. The water intake is about 20 liters per kilowatt hour, the drainage temperature can not exceed 70 ~C, and the general economic drainage temperature is between 55 ~60 ~C.

The circulating water supply system is mainly composed of heat sink, water pump, stabilized water tank, intake and drainage connection pipeline, water pressure meter, valve and so on. The volume of the pool should consider heat dissipation and measure the maximum power consumption, and there is a certain amount of surplus to compensate for water dissipation in the process of circulation. It is suggested that the volume of the pool should be increased as much as possible when conditions permit. The volume of water tank should be considered when the maximum water consumption is constant water supply (see the table of technical parameters for water consumption). When the water supply of the pump is larger than the maximum power consumption of the dynamometer, the volume of the stabilized tank can be recommended to be about 2-5 M3. The smaller the water consumption is, the larger the water consumption is. The volume of the tank is generally about five times that of the tank. If conditions permit, try to be as large as possible.

The diameters of intake and drainage pipes should meet the requirements of the diameters of intake and drainage of dynamometers.

A gate valve and a water pressure gauge shall be connected in series in the intake pipeline. The gate valve is used to regulate the intake pressure. For a fixed engine type, it usually stops moving after one adjustment. Therefore, the gate valve can be installed in any convenient position, while the ball valve on the dynamometer intake pipe is used for opening and closing water supply.

Drainage pipes are generally larger than intake pipes. Drainage pipes can be circulated through clay pipes to the pool. If the user's water source is rich, it can also be discharged into the sewer. Two problems should be paid attention to in drainage pipeline: one is that the drainage can not be connected with the overflow pipe to prevent the overflow pipe from backfilling with excessive drainage pressure; the other is that if the drainage pipeline is not smooth, it will cause excessive backpressure, which will affect the normal test of dynamometer. Therefore, the pipeline arrangement should be as short as possible and with fewer elbows.

The circulating water will be used as dynamometer water after descaling, which will reduce the formation of scale in dynamometer. If there is no water treatment equipment, tap water or clean river water is allowed, but no sediment and other impurities are allowed to mix in. It is not suitable to use sea water. Depending on whether the PH value of water in different areas is high or not, it is necessary to install scale remover.

Figure nine Schematic diagram of water supply system

六、 Installation of dynamometers
1、 Bench Foundation
The test bench foundation is used to install dynamometers and engines. The quality of foundation design will have a great impact on the quality of test. In the design of bench foundation, the following aspects should be considered.
(1) The test-bed should be close to the side of the water source, and the distance between the foundation and the wall should be no less than 1.5 meters. Attention should be paid to the position of the calibration arm when the dynamometer is away from the wall. The whole laboratory requires good ventilation, sufficient light and lighting equipment to meet the requirements.
(2) The base of the bench should have enough mass to minimize the vibration of the bench. The foundation shall be poured with concrete of No. 90 and the proportioning shall be 1 portion of cement: 2.5 portions of yellow sand and 4 portions of stone by volume. Foundation pouring should take into account the measured object, so that the installed dynamometer can test various types of power engines. The position of foundation bolt can be constructed according to figure 10. (Fig. 10 is the foundation map of the installation of hydraulic dynamometer)
(3)Effective vibration isolation measures should be taken to reduce the transmission of vibration energy from the test bed to the outside world. The simple way is to lay a layer of yellow sand under the concrete foundation, and open a 200 mm wide and 800 mm deep anti-seismic groove around the foundation, fill it with sawdust or slag, and cover it with asphalt.
(4)Underground buried pipeline should be carried out before concrete pouring. If the exhaust pipe of power machine is installed underground, it should be more than 0.5 meters away from the pipeline.
2、Installation of dynamometer
Before tightening the anchor bolts, the dynamometer should be calibrated in two vertical directions with the installation accuracy of 1/1000 to ensure the sensitivity and correctness of dynamometer test.
3、Installation of Power Machine
Power machine should be installed according to the requirements of power machine. For some benches with changeable power model, it is better to install the power machine on the accessory bracket with three degrees of freedom (which is supplied by our factory), so as to make the installation and adjustment more convenient. When installing the throttle actuator in the engine, it is necessary to ensure that the stroke of the engine speed control handle is within the stroke of the throttle actuator.
4、Join
Universal coupling or elastic coupling should be used to connect dynamometer with power motor. When using rigid coupling, special attention should be paid to the coaxiality of two-axis installation. Generally, the coaxiality should be within 0.05 mm.
No matter which connection mode, the additional moment and axial force acting on dynamometer should be reduced as far as possible, so as not to cause fever, equipment and life accidents, so that normal testing can not be carried out. It is suggested that an auxiliary support should be installed near the end of dynamometer, which is a better method.
No matter which connection mode, the additional moment and axial force acting on dynamometer should be reduced as far as possible, so as not to cause fever, equipment and life accidents, so that normal testing can not be carried out. It is suggested that an auxiliary support should be installed near the end of dynamometer, which is a better method.


Fig. 10 Foundation Map for Installation of Hydraulic Dynamometer


The dimensions, intake and drainage diameters and locations of the installation foundation are shown in the table.

List of Foundation Dimensions for Installation of YP Hydraulic Dynamometer and Location of Overflow and Drainage Port of Dynamometer Base

Model
A
B
C
D
E
F
G
H
J
K
N
S
Z×L
M
W
g
YP60
1500
1400
500
25
750
900
640
390
340
590
25
90
4-M16×520
335
無(wú)
無(wú)
YP120
1600
1500
500
30
750
900
640
394
335
600
22.5
110
4-M16×540
350
YP250、YP380
1600
1500
500
30
750
900
640
400
330
580
28
100
4-M16×540
340
YP520 YP660
1750
1600
600
30
850
1050
760
490
420
700
35
120
4-M20×570
400
YP880
2000
1800
1200
35
1160
1400
1060
820
650
990
85
310
4-M22×800
/
384
351
YP1200
YP1900
2450
2180
1300
63
1600
1876
1476
1200
1074
1350
63
260
4-M30*1000
/
0
無(wú)
YP2500
YP3300
2560
2250
1500
69
1656
1959
1559
1256
690
1116
1421
70
260
4-M30*1200
/
0
nothing

List of Intake and Drainage Diameters and Locations of YP Hydraulic Dynamometer

Model Inlet caliber Drainage caliber X Y Q
YP60 G1″ G1 1/4″ 143 143
YP120 G1 1/4″ G1 1/4″ 165 165
YP250、YP380 G1 1/4″ G1 1/4″ 162 162
YP520、YP660 Φ50 ZG2″ 221 221
YP880 ZG2″ Φ54 0 354
YP1200、YP1900 ZG3″ Φ85 151 581
YP2500、YP3300 ZG5″ Φ130 203 669

The table is not marked in millimetres.

七、Calibration of Dynamometer
Static arm is generally designed as 973.8mm. Put 1 kilogram of weights on the weighting tray and display 10 Newtons correspondingly; 2 kilograms show 20 Newtons....
For structural reasons, if the arm length is enlarged or reduced to a certain magnification, the display value should also be enlarged or reduced to the same magnification.
The specific operation is as follows:
1. Install static calibration tools: calibration arm and hanging basket; 2、For digital calibration of instrument, please read EMC900 instruction for calibration operation. 3、Remove the calibration tool at the end of calibration. 4、EMC900 controller must be restarted until the end of 100 seconds countdown.
八、Use of dynamometer
1、Before boot

(1) Loosen the bolt of the sensor protection device to make the stator free.

(2) Check the connection between coupling and spindle.

(3) Check the coaxiality of the power machine and dynamometer.

(4) Check the connection and circulation of the inlet and outlet pipe systems.

(5) Clean the appearance, add lubricating oil to each lubrication point, and rotate the spindle to check whether the rotor and other components have collision and rotation inflexibility.

(6) The calibration meets the requirements.

(7) Fully open drainage butterfly valve (minimum load position).

2. Start-up test

(1) Start the power machine to drive the dynamometer spindle to rotate at the same speed. After the power machine is running normally, the test can be carried out.

(2) Fully open the intake valve and adjust the opening of the drainage butterfly valve until it is consistent with the working condition of the power engine.

(3) Four control modes, namely, constant position, constant torque, square torque and constant speed, can be selected to control the electronic control cabinet matched with dynamometer in the test of engine external characteristics, speed regulation characteristics, load characteristics and other characteristics.

(4) For some engines, sometimes the water supply pressure of a fixed dynamometer can not meet the test requirements of all working conditions, which can adjust the water supply pressure properly under different test conditions.

3. End of the experiment

(1) Close the intake valve.

(2) Fully open drainage valve.

(3) The engine runs at low speed for several minutes and then stops.

(4) Rotary sensor protection device, so that the stator is locked, the sensor is not forced.

(5) Cut off the power supply connected with the electronic control cabinet.

(6) Stop lubricating system oil supply.

(7) If the test is not done for a long time, the bottom drain valve of dynamometer should be opened to remove the accumulated water. If conditions permit, the upper end of the shell screw (except YP1900) can be unscrewed and the accumulated water can be purged with compressed air. The position of the screw is shown in Fig. 3 (a), (b).

In order to prevent bearing from entering water, please remember!!! The principle of "first start, then drain; first shut down, then shut down". To ensure that the dynamometer in the rotating state of water, but also should prevent the dynamometer in the anhydrous state of continuous operation for too long and burnt the sealing parts. (Require anhydrous working time is not more than 2 minutes.)

【Refresh】【Favorites】【Print】 【Close】
Previous:Two box temperature shock test chamber Next:YPS type unidirectional hydraulic dynamometer
一级精品999WWW| 久久丁香婷婷五月| 五月天丁香欧美激情| 日韩精品一品二区三区的使用体验 | 99热精品在线播放| 欧美在线视频99| 男女啪啪视频久 9| 97亚洲婷婷| 97操碰视频| 亚洲综合成人网| 狠狠va| 婷婷六月色情| 丁香五月av| 丁香五月综合| 性欧美大战久久久久久久83| 九九久久污| 99人碰碰碰| 亚洲精品操一操、噜一噜、摸一摸、爽 | 开心五月深爱五月丁香五月激情五月| 婷婷五月天人妻| 一本伊人色婷| 日本激情91| 乱精品一区字幕二区| 九九艹女| 爽极品色| 2025天天爽天天摸| 99色色| 精品久久久人妻| 亚洲激情四射色| 五月婷婷黄| 色婷婷狠狠| 开心五月婷| 老妇槡BBBB槡BBBB槡| 色五月丁香五月| 我淫我色婷婷五月天激情四射| 久久久GOGO无码啪啪艺术| 五月丁香婷婷钟和色图| 丁香五月婷婷六月婷婷| 思思久热| 狠狠操综合| 7777国产盗摄农村女人| 男人天堂99| 婷婷 亚洲图片 丁香| 丁香六月婷婷综合缴| 亚洲色视频| 九九九九热99超碰| 97人人射| ji'qi'luan'ren'lun| 日本天堂爱爱| 五月丁香综合久久夜夜| 精品五月视频婷婷在线观看| 丁香六月婷婷综合啪啪| 色五月亚洲| 91超级碰人人操| 26uuu视频欧美| Www.狠狠| 五月天色综合| 9久久久| 99久久99热| 91成人性爱视频| 激情综合一| 大香蕉伊在| 丁香五月图片| 欧美啪啪9| 影音先锋高清无码资源网| enecarbon-materials.comWu染请涟系Bao护@wip1688 | 色五月婷婷91| 婷婷无五月无码视频| 99久热在线精品| 五月婷婷激情综合拍| WWW.99视频| 亚洲xx在线| 久久九九99| 婷婷综合精品视频97| 高清一区二区三区日本久| 激情熟女网| 色综合五月在线| 丁香五月婷婷啪| 九九九九无码| 亚洲婷婷乱乱丁香| 婷婷五月天视频| 日韩欧美一道四区中文字幕| 色婷婷五月天天天干天天操天天爽 | 深爱激情五月天婷婷网| 五月丁香久久| 91日本在线| 第五色婷婷| 五月婷婷激情| 99这里有精品视频3| 丁香网站| 狠狠色丁香久久综合婷婷亚洲成人福利| 岛国午夜视频| 丁香五月激情视频在线| 99热久| 99人人干人人| 婷婷深爱五月丁香| 日韩限制级大尺度黑料泄密大尺度视频一区二区在线观看 | 国产毛片精品一区二区色欲黄A片| 婷婷综合网| 伊人啪啪网| 国产精品视频免费看| 久色中文| 色婷婷丁香A片区毛片区女人区| 超碰成人在线免费观看| 色婷婷婷综合五月天| 五月丁香狠狠爱| 九草性爱| 国产婷婷色综合AV蜜臀AV| 色色亚洲| 99re99热| 99色婷婷视频| 婷婷综合色色| 色情五月婷| 色色色9 9 9| 美女美女美女三级色天天天天天| 九九在线精点品| 欧洲综合一区| www久热com| 久久久国产精品黄毛片| 五月激情综合网| 99免费视频| 亚洲婷婷丁香五月| 婷婷五月天激情综合深爱激情| 色情久久久| 精品爆操| 五月丁香婷婷视频| 天天日夜夜欢| 久久玖玖综合| 五月婷久久久| 麻豆AV一区二区三区| 成人啪啪色婷婷久| 婷婷丁香18| 开心婷婷五月综合| 六月丁香激情综合| 99九九这里有免费视频| 亚洲五月综合色播| 午夜精品人妻无码一区二区三区 | 婷婷月综合| 另类视屏| 97九色视频| 五月婷婷久久大香蕉| 亚洲丁香五月天视频| 日本熟女啪啪| 天天狠狠干| 九九中文色色| 99精品视频网| 全高清无码视頻| 五月天婷综合| 久久综合干| 丁香五月激情网| 六月婷久久| 欧美人与性动交CCOO| 久操干| 真实亲子乱子伦高清在线观看| 51精品国自产在线| 天天操天天操| www.wuyuetian啪啪| 日本欧美国产| 亚洲视频1区| 九九99在线免费在线观看视频| 狠狠搞亚洲| 婷婷性爱综合| www.9797国产| 国产日产成人亚洲欧美国产VA| 五月婷婷五月天| 激情人妻综合| 日韩视频99| 五月天婷婷丁香蜜桃91| 懂色av粉嫩AV蜜臀AV| 婷婷99狠狠躁| 色五月成人| 国产毛片精品一区二区色欲黄A片| 怕怕視頻| 操操操B| 五月丁香六月婷婷开心网| 久久天堂精品| 色婷婷狠狠18禁| 五月香蕉综合| 91a片爽| 丁香五月天综合| 7777激情基地| 在线观看免费视频| 99精品综合| 在线不卡视频| 思思99热| 精品人妻伦一二三区久| 久久五月天色婷婷| 久久婷婷丁香花综合网| 99热| 丁香五月天色综合| 丁香五月婷婷高清| 9999久久久久| 丁香婷婷色五月天| 色久女| 国产精品久久久久久喷浆| 婷婷香五月综合激情| 玖玖色资源| 色色色成人网| 99综合一区| 92久久| 99视频| 婷婷五月激情六月| 思思久久网| 色九四色| caop在线| 99在线国| 91九色视频| 欧美婷婷色| 99热在线观看| 99精品视频在线6| 色开心五月婷婷丁香HD| 婷婷大香蕉| av免费人人| 九九99九九99九九99视频网| 91精品激情9| 婷婷丁香五月综合| 五月激情网五月综合网| 美欧成人视频| 激情婷婷五月天| 五月天婷婷色| 亚洲激情视频网| 91 原创 在线 九色| 狠狠色噜噜狠狠狠狠综合| 夜丁香五月婷婷| 久/久精品99看9| 男女av免费看| 婷婷伊人网| 可以观看的AV| 色噜噜伊人| 伊人五月天97| 日韩av手机在线观看| 国产9色在线/日韩| 久久久久思思热| 99热永久在线观看| 日本97在线| 丁香五月成人| 99色婷婷视频| 狠狠干无码| 中文久久久人妻| 秋霞AV淫| 国产精品男人AV不卡| www.久久久久| 日日综合网| 午夜理论片最新午夜理论剧| 97干视频在线| 99婷五月| 亚洲色网络| 激情深爱五月天| 五月丁香在线婷婷蜜桃| 996热re视频精品视频| 69热91天堂| 高清无码视频网址| 色五月大| 日日天天干| 天天操天天操| 国产亚洲色婷婷久久99精品91| 激情婷婷丁香五月| 5月丁香啪啪啪| 激情五月丁香亭亭 | 五月婷婷之综合激情在线| 久久这里只有精品99| 最近在线更新8中文字幕免费| 99爱视频精品在线观看| 婷婷五月网图片区| 色www99| 五月天激情网图片| 91综合国免费久入| 大地资源中文第3页| 99亚洲欧洲| 九九热这里只有精品23| 操九色| 日本丰满久久| 久久99热网| 成人va在线播放| 五月天伊人综合| 五月天婷婷视频| 襙逼网| 亚洲小视频免费看| 91干视频| 婷婷99丁香| 五月激情综合婷婷| 91se精品国产| 韩国真做片在线观看| 婷婷午夜| 亚洲愉拍99热成人精品| 婷婷五月花| 色中色综合| 天天天日天天天干| 亚洲综合视频一下| 人人色性网| 丁香五月六月久久综合| 色色婷婷五月| 综合激情婷婷| 亚洲午夜AV| 五月 成人 婷婷| 综合色婷婷| 亚洲欧美国产A片免费观看| 丁香六月丁香婷婷激情| 丰满少妇乱A片无码| 日产精品久久久久久久蜜臀| 亚洲成人在线播放| 91美女被操| 久热黄色| 天天搡日日搡aaaaⅩ| 久久婷婷五月天激情| 丁香五月天婷婷激情| 夜夜干天天操| 免费观看欧美成人AA片爱我多深| 五月丁香久久久| 天天粽合合合合| 韩国情人在线电视剧免费观看高清版全集 | www色综合| 91chinese在线| 五月丁香色综合| 五月丁香久久| 国产AV一区二区三区最新精品| 激情婷婷人妻| 五月丁香久久网| 丁香五月网站| 久久综合影院| 婷婷丁香九月| 久久婷婷五月天懂色| 人妻九九九九| 99色色爰| 九九综合视频在线观看| 亚洲亚洲激情| WWW、日本色丁香、co m| AⅤ色区| 色情一区二区播放| 天天插天天插天天插| 婷婷六月花| 热热久久99| 五月婷婷在线免费| 日韩欧美猛交XXXXX无码| 激情久久丁香| www.91操| 丁香桃色网| h在线看免费版在线看| 国产精品久久久久久喷浆| 中文字幕丰满孑伦无码专区| 九九99久久精品| 97操在线| 欧美超碰亚洲| 女操碰| 操日视频| 97久久人人操| 婷婷六月丁香久| A色色| 婷婷五月丁香香蕉| 婷久久| av中文在线| 最近中文字幕2019视频1| 丁香五月之久操视频| 亚洲最大视频网站| 91人操| 天搞天天天天天| 丁香五月成人论坛| 深爱五月网| 无码色| 另类专区在线观看| 七七婷婷综合| 欧美日韩五月婷婷| 99视频自拍| 人人色性网| 五月丁香激情婷婷| 亚洲午夜电影| 中文字幕丰满孑伦无码专区| 人人综合色| 激情综合网激情五月天| 人妻性爱av网站| 丁香五月激情六月综合| 少妇达人正片在线播放_ikun_福利吧| 思思久久99热只有频精品66| 猛烈顶弄H禁欲老师H春潮| 国产成人综合在线| wwwss在线观看| 一区二区你懂的| 大香蕉久久草| 五月婷婷久久开心网| 五月天久久丁香| 五月婷婷|欧美| www.婷婷| 操逼综合网| 丁香六月婷婷开心| 热久久视频99| www,超碰| 久久婷婷五月天| 色婷婷影| 综合五月天亚洲婷婷| 午夜婷婷六月天| 激情综合色婷婷啪啪六月天| 成人无码髙潮喷水A片| 色色色五月| 激情五月婷婷| 久久机热这里只有精品| 1024操逼视频| 成人.在线日韩| 爆乳熟女一区二区三区爆乳| 五月婷婷色男女| 欧美人妻一区二区| 五月婷婷av| 超碰在线资源| 婷婷欧美色| 婷婷开心激情| 日韩中文字幕| 91婷婷伊人牛牛| 丁香五月日本| 丁香五月色五月| 91丁香综合| 久久久性爱网| 天天色天天爱天天爽| 91碰碰视频| 狠狠色丁香乆乆| 操久久网| 噜噜噜久久亚洲精品国产品91| 五月天播播中文字幕 | 亚洲字幕AV一区二区三区四区| 少妇伦子伦精品无吗| 69人人操人人爽| 日本色色网| 俺也去在线视频| 99热精品在线播放| 亚洲视频无| www.夜夜夜| 天堂新版在线| 久久R激情| 91婷婷| 五月天婷婷无码视频| 色偷偷五月天| 天天操天天曰天天射| 欧美噜一噜| 超碰在线免费| 91热久| 亚洲激情高潮| 激情婷婷丁香五月天| 碰久久精品w| www.激情在线| 熟女激情五月天 | 精品九九久久| www.天天干.com| 五月花成人网| 人妻免费网站| 色五月天中文字幕| 国产激情久久久| 大香蕉七区| www开心激情网| www.五月天婷婷| 99日逼视频| 日韩操逼小电影| 免费无码毛片一区二区A片| 区美毛片子| 激情六月日韩| 欧美综合激情| 婷婷九月激情| 亚洲AV网站| 九九色院| 天天激情站| 淫五月停停| 六月丁香成人| 亚洲天堂热| 婷婷 伊人 久久| 天天综合网网欲色| 激情五月天网站| 五月天婷婷基地丁香| 亚洲AV网站在线观看| 99久久終合| 五月丁香五月天现场视频| 色五月亚洲| 亚洲AV网站| 国产真人做爰视频免费| 无码九九九九| 久久婷婷激情视频| 97日本在线播放| 色播五月丁香婷婷| 五月丁香啪啪啪| 91chinese在线| 99热热这里只精品996小说| 综合超碰熟| 性生活久久人妻| 激情五月天网站| 99热欧| 激情五月天小说网| 五月丁香爱婷婷深深| 色色色色综合网| 天天操B| 免费观看18视频网站| 国产婷婷久久| 99re这里| 久久网址99热| 婷婷五月av| 亚洲av成人一区二区电影在线| 丁香婷婷久久| 色噜噜婷婷| 亚洲色综合| av久热| 色婷婷五月在线| 性无码专区无码| 成人av观看| 天天撸天天射| 色婷婷88| 99热热这里只精品996小说| 色激情五月| 亚洲精品V天堂中文字幕| 激情婷婷九月| 免费的视频APP网站入口| 久久91久久91色欲精品| 99爱视频| 五月婷婷丁香大陆免费| 久久婷婷丁香| 91九色国产| 中文字幕AV在线| 97福利视频| 99综合网| 操操操av| 97很鲁在线视频| 99视频这里只有久久精品| 玖玖婷婷色欲| 婷婷五月天激情在线| 日本偷拍九九九| 久久ab| 91一道本| 久久92| 五月丁香六月综合情在线观看| 丁香花成| 久久九九爽| 色婷婷成人| 丁香六月色香蕉视频| 免费观看全黄做爰的视频| 亚洲色婷婷婷婷人人爽| 亚洲激情四射色| 五月丁香婷婷开心| 99久久.www| 久婷久婷| 色婷婷五月天激情| 成人精品视频99在线观看免费| 六月99天天婷婷激情综合| 欧洲色| 欧美亚洲999| 韩日另类| 色亚洲激情| 婷婷丁香五月天影院| av网址在线| 日韩草草草草草草草草草草草草| 五月丁香婷婷基地| 超碰精品手机在线| 亚洲激情六月丁香| 97色97干| www久久五月com| 丁香五月天成人| ji'qi'luan'ren'lun| 超级碰碰碰碰视频| 婷婷激情五月| 热久久66| 激情婷| 丁香伊人网| 狠狠干天天内射| 色五月丁香A欧美com| 99热精品中文字幕| 色停停香蕉视频| 少妇高潮A片无套内谢麻豆传| 色噜噜狠狠色综合伊人| 久久婷婷综合五月| 大地资源中文在线观看官网第二页| 婷婷成人在线| 亚洲午夜av| 翔田千里无码| 欧美丁香五月| 久久人人妻| WWW.色婷婷.COM| 99综合自拍| 色135综合网| 婷婷噜噜| 色~性~乱~伦~噜| 国产69精品久久久久999小说| www.久久五月天.com| 五月婷色丁香| 色五月婷婷中文字幕| 五月丁香婷中文字幕| 海外网站专业操老外| 婷婷导航| 都市激情五月婷婷亚洲| 婷婷黄色| 春色激情| 超碰91人人操| 九九久久综合网站| 亚洲综合草草| 超碰免费人| 影音先锋天天日| 天天日日天天| 小骚穴电影| 伊人综合网站| 99热这里是精品| 婷婷5月色| 99碰在线视频| 五月激情综合网| 激情五月天小说|五月天开心激情网|亚洲精品国产自在现线|黄色五月天 | 激情五月婷婷| 99er这里只有精品| 亚洲情欲久久| 精品久久久人妻| 婷婷五月天黄色小说| 五月天丁香六月综合| 亚洲情欲久久| 天天影院色| 夜夜谢天天干| www.狠狠操.con| 99WWW免费视频| 日本一級黃色一級片| 啪啪 综合网| 五月天激情婷婷小说| 啪啪一区| 91操在线| 国产69久久久欧美黑人A片| 五月丁香综合激情| 五月婷婷免费| 97久久人人| www网站在线观看| www.色婷婷| 草莓视频在线播放视频| 亚洲99在线视频| AV九九| 超碰色人妾| 公的粗大挺进了我的密道| 91色逼| www.亭亭五月天| 五月天丁香啪啪综合| 538任你爽视频不一样的| 91精品91久久久中77777| 五月天综合激情网| 亚洲天码视频www蛋播视频| 午夜理论片最新午夜理论剧| 99热在线观看精品| www.久操| 91操操| 99综合视频| 天天爱天天操| 99热99这里只有精品| 99热香港| 色欲久久综合| 久久99看免费| 五月婷婷黄网站大全| 欧美性色A片免费免费观看的| 六月婷婷在线| 九九热区一区二区三区| 五月份婷婷| 久热AA| 丁香97综合| 欧美日韩成卜| 中文字幕按摩做爰| 91成人品| 香蕉人在线香蕉人在线 | 久久色这里只有精品| 色五月婷婷、老熟女| 天天射影| 色婷婷免费观看| 欧美日韩五月婷婷| 亚洲人成网站999综合| 99热久久这里只有精品| 九九久久网| 97狠狠色| 国产精品日日躁夜夜躁| 九九热这里只有精品在线观看| 只有精品视频在线观看| 久久多色| 大香线蕉伊人| 久人操| 人操人| 国内精品免费一区二区2009| 久久人人做人人妻人人玩精品va| 五月激情婷婷综合| 色99在线| 538在线精品| 涩五月色婷婷| 精品无码99| 热久久视频99| 五月天婷婷伊人| 色的色综合| 日韩抽插操逼| 秋霞午夜理论| 婷婷五月色花丁香社区| 九九成人精品免费视频| 久久五月视频| www.91久久| 五月婷婷六月丁香综合| 丁香婷婷五月色成人网站| 99色精品| www久久艹| 99热99美国在线观看| 九伊人网| 射久久丁香五月| 91se在线观看| 伊人玖玖网| 五月婷婷综合影院| 婷婷综合色网| 色女人久久| 99热精品观看| 51成人| 67194成I人在线观看线路1| 五月婷精品| 久久9视频| 色婷婷综合网| 五月天婷婷色五月天| 国产日批视频免费播放| 就要去操亚洲成人精品五月天丁香婷婷| 亚洲顶级VA在线观看-高清完整版在线影院观看-S022AV | 九九精品网| 日日夜夜天天综合| 久热这里只有精品6| 五月天婷婷丁香| 99性爱| 亚洲熟妇无码乱子AV电影| 国产裸体AAAA片色戒| 色情五月天丁香社区| 激情四射网| 深爱激情五月婷婷| 538在线精品| 久九男女天堂| 久草婷妨| 久久婷婷五月激情综合| 色五月偷偷| 99ri精品| www.激情五月天.com| 中文不卡一二三区| 26uuu亚洲欧美| 天天天久久人人人合| 九九热精品| 五月婷婷色综图片| 五月丁香偷拍| 熟惀91九色在线| 啪啪九九色| 嫩草视频观看| 99超级碰免费视频| 99色啊| 亚洲人妻一区二区| 天天爽,夜夜爽| www.99日本| 天天狠天天叉| 熟惀91九色在线| 狠狠色噜噜色狠狠狠综合色 | av亚洲国产小电影| 五月丁香婷婷欧美色图视频五月丁香777电影 | 大香蕉久久久久久久久| www.婷婷,com| 伊人久久婷婷| 中文字幕丁香五月| 日日舔夜夜操| 国产乱子轮XXX农村| 99热这里是精品| 午夜不卡久久精品无码免费| 丁香六月综合| 色噜噜狠狠色综合成人网| 婷色人人狠| 色五月色五天色情网| 婷婷五月天AV| 超碰免费在线| 九月丁香很很色| 99在线视频免费| 五月色婷婷亚洲 | 中文色婷婷| 内射人妻视频国内| 五月婷九月| 久久久久亚洲AV成人无码电影| 色婷婷9| 久久久久婷婷五月热综合| 亚洲第一视频 久久| 丰满人妻一区二区三区| 色色色色色色色色综合网| 色婷婷丁香花五月天| 九月婷婷综合网| 国产精品久久99| 婷婷色Av| 狠狠干综合网| 欧美日本免费一道免费视频| 99碰碰碰| 亚洲旡码| 森林影视大全,最好看的2019年视频| 丁香婷婷久久老熟女综合网| 色色亚洲五月天| 色色色免费视频| 综合福利网| 五月丁香激情怕怕| 色爱综合视频| 天天狠狠夜夜狠狠2023| 97色婷| 九久久九精品视频| 色情五月婷| 五月激情婷婷六月丁香| 性色五月天| 热久精品| 人人操人| 五月婷婷开心深| 操人妻视频91| 91色久| 字母不卡码人逼| 日韩999| 六月狠狠综合| 91婷婷色五月| 激情婷婷五月丁香啪啪啪| 99超级碰碰| 校园激情 亚洲| www,超碰| 色婷婷呢狠禁久禁| 91在线看免费 九九九九| 99热久只有| 四房播播网| 国产人妻人伦精品一区二区| 91日韩美女被插视频| 九九免费精品在线视频| 激情五月婷婷在线观看| 精品一二三区久久AAA片| 久婷首页| 久久奄也去色色网站| 五月丁香婷婷婷激情爱爱| 国产无套精品一区二区| 亚洲无码yw| 婷婷五月AA五月在线| 五月开心播播网| 97在线99| 九九九热精品| 久久人妻视步| 五月丁香啪啪| 97色女人在线| 这里只有免费的精品| 亚洲成人综合在线| 色婷婷aV四虎| 九九热这里精品| 噜噜狠狠色综合久| 激情五月婷婷老师| www.狠狠| 久久美女五月天| 大香蕉综合网| 色色色色综合网| rr天天操| 99热免费观看| 五月天婷婷免费| 婷婷开心久久| 成人无码髙潮喷水A片| 色综合天堂| 婷婷五月骚厕所| 精品无码久久久久久久久| 色婷婷AV在线| 欧美色色色色色色色| 99热网站| 日本久久人| 天天综合影院| 三男玩一女三A片| 亚洲综合久| 无码操B| 综合久久激情久久| 91天天操天天干天天射| 五月婷婷综合在线| 丁香婷婷久| 深爱五月天婷综合| 久久久婷| 久久香蕉丁香| 啪啪小说五月天| 99久在线精品99re8热| 激情丁香五月天综合| 丁香花在线高清完整版视频| 六六久久黄色| 五月婷丁香在线视频在线| 久久婷综合| 九九色欲网| 色色性爱视频| 九九无毛| 欧美丁香五月天| 久久婷婷亚洲| 亚洲AV免费在线| 午夜神| 亚洲精品444久久久久久| 夜夜夜夜操| 国产精品18久久久| 人人色人人摸人人看| 五月丁香婷草| 欧美超碰人人| 这里只有精品网| 日本色99网站| www.日韩艹| 亚洲情综合五月天| 五月丁香婷婷福利| 97干97色| 中文字幕视频在线播放| 天天操综合网| 国产44页| 五月婷精品| 五月丁香综合色婷婷| 青娱乐美女福利视频美臀| 婷婷色婷婷| 婷婷六月丁香开心深深爱| 99精品热视频| 伦乱天堂| 欧洲综合视频| 97碰碰在线看视频免费| 婷婷五月天AV在线| 欧美日韩成人在线网| 欧美va在线观看| WWW色色色COM| 婷婷四色成人综合色视| 国产成人综合电影| 春色激情第四色| 美国少妇性做爰| 色必久悠悠影院| 成人免费120分钟啪啪| 成人视频九九| 久久九九国产精品怡红院| 久久婷婷五月综合97色一本| 欧美三级欧美一级| 色9999日韩国产| 狼人久草| 色色婷婷五月天| 色婷婷小说| 久久婷婷伊人| 色情五月婷婷| 影音先锋女人av鲁色资源网小说免费| 亚洲爆乳无码精品AAA片蜜桃| 午夜在线成人网站免费观看| 思思精品久久艹| 色欲久久99精品久久久久久| 九月色婷婷综合| www.韩日视频| 99精品免费欧美小视频 | 天堂综合久| 吊色AV男人的天堂| 中文AV在线观看| 久久99久久99精品免观看粉嫩| 五月激情站| 九九干视频| 97色婷婷| 日日干天天射| 亚洲永久免费| 五月激情丁香六月狠狠干| 欧美性猛交99久久久久99按摩| 久久久www| 五月丁香六月激情欧美综合| 成人AV免费观看| 色婷丁香| 玖玖伦理电影| 96精品成人无码A片观看金桔| 五月天激情综合在线| 日本婷婷五月天| 日韩一66精品| 97 天堂| 婷婷开心六月| 日韩精品99久久| 五月婷婷久久大香蕉| 超碰在线免费| 99热精品在线播放| 色婷婷五月天天天做| 大香蕉久久综合网| 婷婷五月天第三页| 亚洲AV网址| 久久婷婷五月天| 天天天天天色| 久热久69| 婷婷五月天小说| 亚洲丁香花色| 激情内射人妻1区2区3区| 五月婷婷激清网| 另类图片色五月| 可以看的av| 99爱免费在线观看| 任你艹| 青青福利网| 亚洲精品白浆高清久久久久久| 99精品人人| 99视频久久| 丁香五月第九色| 九色视频入口91| 丁香花网站| 丁香五月激情综合| 婷婷五月影院| 99操逼| 伊人超碰| 亚洲亚洲人成综合网络| 日日操天天爽| 一月婷婷色色| 综合激情视频| 丁香五月停停av| 婷婷激情五月天小说| 色婷婷操逼| www.五月天婷婷姐姐| 婷婷五月激情视频网| 九九色色网| 婷婷激情五月综合基地| 丁香五月婷婷www..com| www.色五月.com| 26uuuu精品一区二区| 色爱综合五月| 天天干天天色综合| 五月丁香AV在线| 亚洲午夜电影| 男女啪啪做爰高潮无遮挡| 丁香月六月| 97色碰| www,99视频| 午夜丁香综合婷婷| 五五月五月| 国产资源在线视频| 涩综合婷婷| 色色色色五月| 99在线观看视频免费| 偷拍九九热| 色久九| 五月天婷婷久色| 婷婷五月天丁香成人社区| 激情六月综合| 99热99热不卡| 五月婷婷大香蕉| 5Www色5夜| 日本啪啪天堂| 成人丁香婷婷五月天| 亚洲综合网 665566| 天天干,天天日| 丁香花高清在线完整版| www.狠狠操.con| www.97干视频| 激情五月婷婷| 在线网黄| 日韩综合大黄| 丁香五月婷婷啪啪啪| 97成人丁香| 亚洲区视频| 狠狠搞亚洲| 91久久久久久| 久热伊人在91| 99精品视频在线观看| 操骚货在线| 五月色丁香国产在线视频| 五月丁香大相交| 97 天堂| 色五月琪琪| 无码人妻一区| 激情丁香久久| 97超碰在线免费观看| 黄急一级视频| 五月丁香六月激情综合| 99色最新在线视频网站| 亚洲精品va| 婷婷五月天丁香激情| 99在线免费观看| 九九九九综合| 啪啪亚洲综合| 99在线观看视频蜜臀| 超碰a女人的天堂| 一二线视频 另类| 日韩无码专区| 伊人在线视频| 全国最新疫情| 五月伊人网| 丁香五月激情久久麻豆| 亚洲视频二区| 久久色五月天激情小说| 婷婷色播色五月五色五月天色妇| 丁香五月激情图片婷婷| 婷婷久久亚洲| 色婷婷在线视频综合| 色婷婷五月综合| 懂色av蜜臀av粉嫩av永陈冠希 | 婷婷五月天深爱| 五月天堂婷婷| 日本情色一区二区| 欧美在线| 久久99综合| 丝瓜污视频| WWW.99热| 婷婷深爱五月天在线| 99久久综合| 99色久| 丁香五月色激情| 香蕉AV777XXX色综合一区| 91黄操| 欧美激情VA永久在线播放| 激情综合五月色丁香婷婷| 那里有AV网址| 玖玖爱伊人| 成人在线日韩欧美| www.丁香黄色五月天人与| 色色com| 97在线精品视频| 天天日天天插| 丁香 婷婷 亚洲 熟女| 欧美性爱特黄一级aaaassss| 综合激情五月四射婷婷| 久久婷婷五月综合精品蜜芽| CAOBIBI| 人妻免费网站| 欧美成人精品三区综合A片| 午夜丁香| 99热在线中文字幕| 综合网亚洲| 好激情在线综合网| 99精品视频在线| 99re思思精品视频在线观看| 五月天婷婷av| 精品牛仔裤超碰| 97人人爱人人操| 91久久人人操| 婷婷五月综合性爱| 91人在线观看| 五月婷婷中文字幕| 亚洲精品国产成人AV在线| 色五月色图| 六月伊人| 婷婷五月天综合久久| 激情开心五月天婷婷基地丁香社区| 亚洲夜五月| 91九色精品女同系列| 91丨九色|PRNY熟妇| 99热99草97| 墨西哥毛片内射精| 沈娜娜av| 丁香五月瑟瑟| 久久国产一区二区三区| 色丁香五月婷婷| www色五月| 天天玩夜夜操| 亚洲无码另类| 大香蕉综合在线| 日本超碰在线| 六月色播| 久久婷婷五月综合色奶水99啪| 丁香六月婷婷综合啪啪| 五月婷婷视频ab| 99色丁香婷婷综合网| 日日操,日日爽| 天天插轮理| 六月丁婷婷| 五月天激情网图片 - 百度| 日韩成人网站精品久久大全| 久鲁鲁色网| 久久黄色网扯| 天干干夜夜操| 婷婷丁香五另类网站| 天天上天天爽| 亚洲AAA| 九九热这里只有国产精品| 九九一综合精品| 在线综合婷婷| 热久久视频99| 久久这里只有欧美| 婷婷五月天综合中文| 五月天久久综合婷婷丁香| 亚美欧色影院| 亚洲综合99| 99久视频| 看全色黄大色大片| 久久东京热婷婷五月| 五月婷婷激情综合| 色欲色香综合网| 综合五月天| 成人国产欧美大片一区| 一级黄色影片| 91夫妻网站九色| 伊人成综合五月婷婷| 色五月天丁香婷婷色| 亚洲av网址| 大香蕉久久久| 激情综合网五月在线播放| 丁香香五月激情免费视频| 婷婷亚洲激情在线观看视频|