俄罗斯国产精品Av_国产天堂网免费_在线观看中文字幕欧美_日本色色色w ww_伊人色域影视五月情在线观看_亚洲欧洲操逼视频_乳头无码优质视频_99r这里只有精品91麻豆_嫩模私拍在线播放_久操手机_深夜老司机福利一区_咸阳毛片_久久久区九_欧美成人大香蕉1532区_青草草国产免费大片

products 產(chǎn)品列表

 YP Series (Pressure Type) Hydraulic Dynamometer
 Hits:32820 AddTime:2024/2/4 9:27:21

一、Summary

YP series (pressure type) hydraulic dynamometers have been widely used abroad in the 1960s and 1970s. In 1985, through license trade, China introduced the technology of Zoller Company, West Germany, to develop and produce this type of advanced dynamometer. At present, the process technology has been used in the production of a whole series of products in China. Internationally, there are Fraud in England and Cairn Company in the United States. In addition, two domestic companies have produced this series of products in small batches through imitation. Our company digests and absorbs foreign technology, carries out new optimization design and production, and can provide a full range of products.

YP series hydraulic dynamometer has 12 specifications, all of which are controlled by electric drainage butterfly valve. That is, by changing the opening of butterfly valve to change the size of absorption power. The braking power range is from 20KW to 5900KW, and the variety is complete. Domestic and foreign users choose the right type according to their engine power range.
This product is mainly used to test the effective power of various diesel engines, gasoline engines, motors and other power engines. It is an indispensable test equipment in the performance test of power engine and the efficiency test of transmission machinery.
The basic model of this product is one-way test. If users need to order with two-way test at the same time, please make a request and our company will give special customization.

二、Technical specifications

1.Main features
◆Small size, easy installation;
◆Simple structure, easy operation and maintenance;
◆High braking moment;
◆High accuracy of measurement;
◆Work stably and reliably;
◆Achieving High Precision Instantaneous Speed Measurement with Magnetoelectric Velocity Sensor;
◆Fast Load Control of Electronically Controlled Butterfly Valve;
◆Fast response, suitable for dynamic test

2.Measuring performance indicators

Project sensor type Measuring range Accuracy Remarks
Rotating speed ZSB magnetoelectric speed sensor 300-7500r/min ±1r/min
Greater than 7500r/min
When the speed wheel and control components are treated separately.
Torque Strain gauge tension sensor Match the dynamometer range ±0.2% FS
Water valve position
Precision potentiometer
(DPF, YZ60 Watergate Actuator)
0-100% 0.2% FS
Throttle position
Precision potentiometer
(YZ60, YZ60A throttle actuator)
0-100% 0.2% FS

3.Technical parameter


Hydraulic dynamometer model
YP60 YP120 YP250 YP380 YP520 YP660 YP880 YP1200 YP1900 YP2500 YP3300
Maximum absorption rate (KW) 60 120 250 380 520 660 880 1200 1900 2500 3300
Torque measurement accuracy (FS) ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2% ±0.2%
Speed ​​measurement accuracy (FS) ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰ ±0.5‰
Spindle rotation direction unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional unidirectional
Brake force measurement range (N) 0~180 0~550 0~1000 0~1300 0~2500 0~3300 0~6000 0~12000 0~18000 0~27000 0~35000
Maximum braking torque (Nm) 172 525 980 1240 2450 3150 5700 11760 17200 26460 33400
Maximum water consumption (Kg/h) 1200 2400 5000 8000 10400 13900 18500 24000 36300 50000 66000
Drainage maximum temperature (°C) 70 70 70 70 70 70 70 70 70 70 70
Total length of the spindle 448 510 500 500 600 600 802

1296

1296 1440 1440
Spindle cone length and taper 63, 1:30 70, 1:30 70, 1:30 70, 1:30 70, 1:30 80, 1:30 100, 1:30 192, 1:30 192, 1:30 170, 1:30 170, 1:30
The center of the spindle is high to the bottom of the base 255

300

300 300 350 350 650 760 760 840 840
Dynamometer dimensions (length × width × height) 450×400×370 655×530×430 640×536×460 640×536×460 760×620×543 760×620×543 1078×845×905 1598×.51310×1135 1598×.51310×1135 1452×1558×1310 145×21558×1330
Base size (length × width × height) 640×400×90 640×394×110 640×400×100 640×400×100 760×490×120 760×490×120 1060×820×310 1476×1200×260 1476×1200×260 1256×1559×260 1256×1559×260
Foot screw hole position 590×340 600×335 580×330 580×330 700×420 700×420 990×650 1350×1074 1350×1074 1421×1116 1420×1116 
(×690)
Dynamometer net weight (Kg) 170 180 200 200 410 435 950 2800 2900 3200 3300
Maximum spindle speed (r/min) 9000 7500 7500 5000 5000 3500 3000 3000 3000 3000 3000
Moment of inertia 
(Kg.M2)
0.012 0.041 0.065 0.074 0.480 0.511 0.721 3.6 4 6.8 7.1

Table units:mm

4. characteristic curve

The application scope of hydraulic dynamometer can b e seen from its characteristic curve as shown in Fig. 1 (a), (b), (c), (d), (e), (f), (g), (h). Characteristic curve shows the power range that dynamometer can absorb at different rotational speeds.
The OA curve represents the maximum power line that the dynamometer can absorb with the change of rotational speed under a certain inlet pressure.
When AB line keeps the dynamometer's maximum torque, the maximum power line that dynamometer can absorb will change with the speed.
When the AC line (YP20) and BC line are not more than the maximum permissible discharge temperature of dynamometer, the maximum power limit line that dynamometer can absorb.
CD line is the maximum speed limit line of dynamometer.
OD curve is the braking power line (air friction resistance) of Dynamometer when it is not filled with water.
The area surrounded by the curve graph OABCDO indicates the power range that the hydraulic dynamometer can absorb. This is also the basis for choosing dynamometer in power machine performance test. In general, all the characteristics of the power machine can be tested on this type of hydraulic dynamometer within the range of curve and figure.
﹡When choosing dynamometer, users must pay attention to whether the test point of the dynamometer is within the range of the characteristic curve of the dynamometer and avoid the edge of the curve as far as possible.
﹡The minimum absorptive power line (full open position of butterfly valve) is slightly higher than OD line under the optimal control of water filling, and should not be too close to OD line when selecting type.

三、Structure of dynamometer

YP type hydraulic dynamometer is mainly composed of body parts, force measuring mechanism parts, intake and drainage parts, correction parts, electric drainage valve parts, automatic regulating device parts and lubricating parts. See Figures II (a), (b).
1.Body parts
The body parts are the main parts of dynamometer to absorb the effective torque of power machine by using water. See Figures III (a), (b).
The mechanical energy output from the power machine is converted into heat energy here, which is absorbed by the water entering the shell and discharged. A very small part of the mechanical energy is dissipated to the air by the wall of the dynamometer shell.
The simple structure consists of a swinging housing mounted on a rolling bearing and a rotor mounted on a spindle. The dynamometer rotor is installed in the middle of the main shaft, and the left and right side shell and the left and right bearing shell are symmetrically installed on both sides of the rotor. The working cavity is formed by the rotor pit and the left and right side shell pit. The bimetallic bushing connected with the shell of the left and right bearing not only acts as the bushing, but also acts as the sealing water. YP880, Y1200, YP1900, YP2500, YP3300 and YP5900 dynamometers are sealed by clearance to prevent water from entering the bearing, thus ensuring the service life of the bearing.
There are drainage holes on the shell and water intake holes on the left and right bearing shell to ensure the entry of low-temperature water and the discharge of high-temperature water. There is an overflow pipe in both the left and right bearing housing, and the water thrown out by the water throwing ring is discharged after the overflow pipe enters the base.
The spindle is equipped with coupling at both ends of the cone, and the speed measuring gear is installed on one side. Through the speed measuring sensor, the spindle speed can be displayed in the digital display table.


Figure two(bY880-SY1900-S、Y3300-SOutline schematic diagram of hydraulic dynamometer

1、Body parts2、Dynamometer unit 3、Lubrication parts 4、Intake and drainage components5、correcting member6、Automatic adjusting device components

Figure three(a)YP1900Structural sketch of airframe components

1、base  2、Left and Right Bearing Seats  3、Spindle components  4、Coupling  5、Bearing plate  6. Skeleton oil seal 7, axle sleeve 8.9, bimetal axle sleeve & nbsp; 10, left and right bearing shell & nbsp; 11, left and right side shell & nbsp; 12, screw & nbsp; 13, rotor 14, shell & nbsp; 15, water seal ring & nbsp; 16, speed measuring gear & nbsp; 17, speed sensor & nbsp; 18, overflow pipe & nbsp; 19, cock

Figure three(b)YP1900Structural sketch of airframe components

1、base 2. Bearing seat 3, coupling 4, spindle component 5, bearing shell 6, shell 7, side shell 8, rotor 9, speed sensor 10, speed measuring gear


2.Force measuring mechanism components
The components of force measuring mechanism are used to measure braking force, as shown in Fig. 4 (a), (b).

It is mainly composed of brake arm, tension pressure sensor and movable bolt. The braking moment produced by the body parts is balanced with the reaction moment of the brake arm pull-up pressure sensor, and the braking force is displayed by an electronic digital display instrument. In order to protect the sensor, nylon ring or rubber ring is installed at one end of the movable plate bolt to play a buffer role. At the same time, in order to prevent the sensor from being damaged by vibration in transportation, a supporting and fixing protection device is provided. The bolt of the fixed sensor must be loosened in use, and the movable plate should be pulled to one side. If there is no movable plate, the bolt can be screwed off.


Figure four(a)YP20、YP60、YP120、YP250、YP380、YP520、YP660

Drawing of Force Measuring Mechanism Components

1. Brake arm 2, tension and pressure sensor 3, movable bolt 4, support 5, protective cover 6, movable plate 7, bolt 4


Figure four(b)YP1900Schematic diagram of dynamometer mechanism

1. Brake arm 2, fixed bolt 3, movable bolt 4, tension pressure sensor


3、Intake and drainage components
The intake and drainage components are composed of intake components and drainage components. It is mainly used for entering low temperature water and discharging high temperature water when dynamometer works. See Fig. 5 (a), (b).
YP60, YP120, YP250, YP380, YP520 and YP660 hydraulic dynamometers are composed of brackets, pipes and elbows. The elbows are connected with the left and right bearing housing of the body parts to form the intake pipeline of the dynamometer.
The drainage components are composed of brackets, pipes and elbows. The elbow is connected with the outer shell to form a drainage pipeline of dynamometer. The water thrown out by the water throwing ring in the body parts is discharged after the overflow pipe enters the base.

The intake parts of YP880, YP1200, YP1900, YP2500, YP3300 and YP5900 dynamometers are composed of intake valve parts and intake pipes. The drainage components are composed of a drainage butterfly valve, a drainage elbow and a drainage actuator.


Figure five(a)Drawing of Intake and Drainage Components

1. Overflow pipe 2, permeable pipe 3, intake parts (5, elbow 6, pipeline 7, bracket) 4, drainage parts (8, bracket 9, pipeline 10, elbow)

Figure five(b)Y880-S、Y1900-S、Y3300-SDrawing of Intake and Drainage Components

1. Spillway 2, Intake Component 3, Drainage Actuator 4, Drainage Butterfly Valve 5, Drainage Bend

4、  Calibration Component (Static Calibration Component)
Calibration components are used for static calibration of dynamometers, as shown in Fig. 6.
It is mainly composed of calibration arm, lifting parts, suspenders, trays and weights.
The distance L from the center of dynamometer spindle to the triangular knife edge of static calibration arm and the total weight W are shown in the table below.
L and W values


Model Arm lengthL(mm)±0.125 Weight total weightW(kg)
YP60 973.8 18
YP120 973.8 55
YP250 468.9 200
YP380 486.9 260
YP520 973.8 250
YP660 973.8 330
YP880 973.8 600
YP1200 1947.5±0.30 600
YP1900 1947.5±0.30 900
YP2500 1947.5±0.30 1350
YP3300 1947.5±0.30 1750

Fig. 6. Schematic diagram of correction components
1. Correction arm 2, lifting parts 3, lifting rod 4, tray 5, weights

5. & nbsp; Electric Drainage Valve Components
DPF electric drain valve components are used to automatically control the opening position of the drain valve, adjust the pressure of the dynamometer chamber, so that the thickness of the water ring changes with the change of working conditions, that is, to change the absorption load, as shown in figure 7.
It is mainly composed of shell, moment motor, planetary gear pair, butterfly valve, potentiometer and so on. Matching with the electronic control cabinet, the opening of the valve can be controlled by the compartment.

YP60、YP120、YP250、YP380、YP520、YP660 Hydraulic dynamometers use this form to control the drainage butterfly valve



Figure sevenDiagram of DPF Electric Drainage Valve Components

1. Potentiometer 2, Torque Motor 3, Planetary Pair 4, Shell 5, Butterfly Valve

6、   Automatic adjusting device components
The components of the automatic regulating device control the opening position of the valve slice of the drainage butterfly valve through the drainage actuator, and adjust the pressure of the inner chamber of the dynamometer to change the load, as shown in figure 8.

Fig. 8. Component sketch of automatic regulating device
1. Drainage Actuator 2.3, Gear Pair (Synchronized Tooth Belt) 4, Angle Iron 5, Drainage Butterfly Valve 6, Support Plate

It is mainly composed of drainage actuator, drainage butterfly valve, supporting plate, gear pair, etc.

YP880, YP1200, YP1900, YP2500, YP3300, YP5900 hydraulic dynamometers all use this form to control the drainage butterfly valve.

YP880, YP1200, YP1900 dynamometers are equipped with YZ60A drainage actuator produced by our factory, YP2500, YP3300, YP5900 dynamometers are equipped with YZ20 drainage actuator.


7、Lubrication parts
Lubrication parts are mainly used for rolling bearing lubrication of dynamometer.
YP60, YP120, YP250, YP380, YP520 and YP660 hydraulic dynamometers are all lubricated with grease, and their locations are shown in Fig. 2 (a). ZL45-2 lithium-based grease can be directly injected into the pressure oiler (tanker). The specific requirements are shown in Schedule 4.
The lubrication components of YP880, YP1200, YP1900, YP2500, YP3300 and YP5900 hydraulic dynamometers are shown in Figure 2 (b). Oil mist lubrication, drip oil lubrication and pump oil lubrication can be used respectively according to user's requirements and different working conditions.

(1)Oil mist lubrication

Oil mist lubrication can be used when dynamometer works at medium and high speed. Oil mist lubrication is mainly composed of gas source, pressure reducing valve, oil mist, gas pipe and so on. V-01/10 compressor can be used as gas source for a single dynamometer. Before starting the dynamometer, it is necessary to ensure the normal operation of the oil mist system. Oil mist lubrication is detailed in the instructions for the use of oil mist lubrication devices.

(2)Drip lubrication When the dynamometer works at a low speed, it can adopt drip oil lubrication instead of oil mist lubrication or pump oil lubrication.

If the working speed of YP1900 hydraulic dynamometer is below 2200 r/min, and YP3300 hydraulic dynamometer is below 1800 r/min, oil drop lubrication can be used.

(3)Pump oil lubrication

When the dynamometer works at a high speed, in order not to make the bearing temperature rise too high, the pump oil lubrication can be used.

Pump oil lubrication is mainly composed of pumping station and inlet and outlet oil system. Pump oil lubrication must start the pump station to lubricate the bearing of dynamometer before starting the dynamometer main engine and adding water for testing. Pump

oil inlet pressure can be adjusted by LI-10 throttle valve, and the pressure can be controlled in the range of 0.01-0.05 Mpa. It is suggested that as long as the working conditions are satisfied, the pressure should be as low as possible to reduce leakage.

四、Working Principle and Power Calculation of Dynamometer

1、 Working principle

The power machine drives the rotor components on the dynamometer spindle to rotate synchronously through the coupling, which stirs the water in the working chamber. Because of the centrifugal force produced by rotor rotation and the effect of rotor pits, water produces strong water eddy current between the side shell and the rotor pit. It gives the shell a rotating moment, so that the torque of the power machine is transmitted from the rotor to the shell. The brake arm mounted on the shell will rotate at an angle, so that the brake force is transmitted to the tension pressure sensor connected with the brake arm through the electronic digital display device. Display the braking force.

The dynamometer controls the opening of butterfly valve by electric drainage valve or drainage actuator by automatic regulating device. The opening of butterfly valve is controlled by drainage actuator to change the pressure of water in the working chamber of dynamometer to change the absorption power. At the same time, the speed of dynamometer can be measured by the speed sensor and displayed on the electronic display instrument.

Because it is a pressure-controlled hydraulic dynamometer and adjusts the pressure of working chamber by changing the opening of butterfly valve, the whole process must be an automatic closed-loop control system, so the pressure YP dynamometer must be equipped with an electronic control cabinet with automatic control function to operate.

2、 Calculation
(1)Power calculation
The effective power of dynamometer can be calculated by the following simple formulas when the length of statically calibrated arm is 973.8mm, guaranteed by the structure design.:
P= F n/ 10000 (Kilowatt)
Type: F--- loading (Newton)
N - Speed (Rotation/Point)
(2)Torque calculation
M=F.L (N.M)
Type:F---load(Newton)

L---Calculated arm length is 0.9549(m)

五、Water supply system of dynamometer
The water supply of dynamometer can be used in circulating water supply system. The water supply is provided by high pressure stabilizing water tank or low pressure stabilizing water tank plus pipeline pump. Generally, the indoor water tank in the north is composed of a low-level stabilized water tank and a pipeline pump (see figure 8).
The intake pressure of dynamometer can be greater than or equal to 0.05 MPa, usually 0.05-0.15 MPa. When the dynamometer works on the full water line, it requires higher water supply pressure; when it works below the full water line, the water pressure can be lower. The water supply pressure should be kept stable, and the range of pressure fluctuation should be (+5KPa). When the dynamometer works, the water supply pressure directly affects the cavitation degree of the side shell of the dynamometer and the concave working chamber of the rotor.
In the process of dynamometer operation, water intake can not be interrupted. The water intake is about 20 liters per kilowatt hour, the drainage temperature can not exceed 70 ~C, and the general economic drainage temperature is between 55 ~60 ~C.

The circulating water supply system is mainly composed of heat sink, water pump, stabilized water tank, intake and drainage connection pipeline, water pressure meter, valve and so on. The volume of the pool should consider heat dissipation and measure the maximum power consumption, and there is a certain amount of surplus to compensate for water dissipation in the process of circulation. It is suggested that the volume of the pool should be increased as much as possible when conditions permit. The volume of water tank should be considered when the maximum water consumption is constant water supply (see the table of technical parameters for water consumption). When the water supply of the pump is larger than the maximum power consumption of the dynamometer, the volume of the stabilized tank can be recommended to be about 2-5 M3. The smaller the water consumption is, the larger the water consumption is. The volume of the tank is generally about five times that of the tank. If conditions permit, try to be as large as possible.

The diameters of intake and drainage pipes should meet the requirements of the diameters of intake and drainage of dynamometers.

A gate valve and a water pressure gauge shall be connected in series in the intake pipeline. The gate valve is used to regulate the intake pressure. For a fixed engine type, it usually stops moving after one adjustment. Therefore, the gate valve can be installed in any convenient position, while the ball valve on the dynamometer intake pipe is used for opening and closing water supply.

Drainage pipes are generally larger than intake pipes. Drainage pipes can be circulated through clay pipes to the pool. If the user's water source is rich, it can also be discharged into the sewer. Two problems should be paid attention to in drainage pipeline: one is that the drainage can not be connected with the overflow pipe to prevent the overflow pipe from backfilling with excessive drainage pressure; the other is that if the drainage pipeline is not smooth, it will cause excessive backpressure, which will affect the normal test of dynamometer. Therefore, the pipeline arrangement should be as short as possible and with fewer elbows.

The circulating water will be used as dynamometer water after descaling, which will reduce the formation of scale in dynamometer. If there is no water treatment equipment, tap water or clean river water is allowed, but no sediment and other impurities are allowed to mix in. It is not suitable to use sea water. Depending on whether the PH value of water in different areas is high or not, it is necessary to install scale remover.

Figure nine Schematic diagram of water supply system

六、 Installation of dynamometers
1、 Bench Foundation
The test bench foundation is used to install dynamometers and engines. The quality of foundation design will have a great impact on the quality of test. In the design of bench foundation, the following aspects should be considered.
(1) The test-bed should be close to the side of the water source, and the distance between the foundation and the wall should be no less than 1.5 meters. Attention should be paid to the position of the calibration arm when the dynamometer is away from the wall. The whole laboratory requires good ventilation, sufficient light and lighting equipment to meet the requirements.
(2) The base of the bench should have enough mass to minimize the vibration of the bench. The foundation shall be poured with concrete of No. 90 and the proportioning shall be 1 portion of cement: 2.5 portions of yellow sand and 4 portions of stone by volume. Foundation pouring should take into account the measured object, so that the installed dynamometer can test various types of power engines. The position of foundation bolt can be constructed according to figure 10. (Fig. 10 is the foundation map of the installation of hydraulic dynamometer)
(3)Effective vibration isolation measures should be taken to reduce the transmission of vibration energy from the test bed to the outside world. The simple way is to lay a layer of yellow sand under the concrete foundation, and open a 200 mm wide and 800 mm deep anti-seismic groove around the foundation, fill it with sawdust or slag, and cover it with asphalt.
(4)Underground buried pipeline should be carried out before concrete pouring. If the exhaust pipe of power machine is installed underground, it should be more than 0.5 meters away from the pipeline.
2、Installation of dynamometer
Before tightening the anchor bolts, the dynamometer should be calibrated in two vertical directions with the installation accuracy of 1/1000 to ensure the sensitivity and correctness of dynamometer test.
3、Installation of Power Machine
Power machine should be installed according to the requirements of power machine. For some benches with changeable power model, it is better to install the power machine on the accessory bracket with three degrees of freedom (which is supplied by our factory), so as to make the installation and adjustment more convenient. When installing the throttle actuator in the engine, it is necessary to ensure that the stroke of the engine speed control handle is within the stroke of the throttle actuator.
4、Join
Universal coupling or elastic coupling should be used to connect dynamometer with power motor. When using rigid coupling, special attention should be paid to the coaxiality of two-axis installation. Generally, the coaxiality should be within 0.05 mm.
No matter which connection mode, the additional moment and axial force acting on dynamometer should be reduced as far as possible, so as not to cause fever, equipment and life accidents, so that normal testing can not be carried out. It is suggested that an auxiliary support should be installed near the end of dynamometer, which is a better method.
No matter which connection mode, the additional moment and axial force acting on dynamometer should be reduced as far as possible, so as not to cause fever, equipment and life accidents, so that normal testing can not be carried out. It is suggested that an auxiliary support should be installed near the end of dynamometer, which is a better method.


Fig. 10 Foundation Map for Installation of Hydraulic Dynamometer


The dimensions, intake and drainage diameters and locations of the installation foundation are shown in the table.

List of Foundation Dimensions for Installation of YP Hydraulic Dynamometer and Location of Overflow and Drainage Port of Dynamometer Base

Model
A
B
C
D
E
F
G
H
J
K
N
S
Z×L
M
W
g
YP60
1500
1400
500
25
750
900
640
390
340
590
25
90
4-M16×520
335
YP120
1600
1500
500
30
750
900
640
394
335
600
22.5
110
4-M16×540
350
YP250、YP380
1600
1500
500
30
750
900
640
400
330
580
28
100
4-M16×540
340
YP520 YP660
1750
1600
600
30
850
1050
760
490
420
700
35
120
4-M20×570
400
YP880
2000
1800
1200
35
1160
1400
1060
820
650
990
85
310
4-M22×800
/
384
351
YP1200
YP1900
2450
2180
1300
63
1600
1876
1476
1200
1074
1350
63
260
4-M30*1000
/
0
YP2500
YP3300
2560
2250
1500
69
1656
1959
1559
1256
690
1116
1421
70
260
4-M30*1200
/
0
nothing

List of Intake and Drainage Diameters and Locations of YP Hydraulic Dynamometer

Model Inlet caliber Drainage caliber X Y Q
YP60 G1″ G1 1/4″ 143 143
YP120 G1 1/4″ G1 1/4″ 165 165
YP250、YP380 G1 1/4″ G1 1/4″ 162 162
YP520、YP660 Φ50 ZG2″ 221 221
YP880 ZG2″ Φ54 0 354
YP1200、YP1900 ZG3″ Φ85 151 581
YP2500、YP3300 ZG5″ Φ130 203 669

The table is not marked in millimetres.

七、Calibration of Dynamometer
Static arm is generally designed as 973.8mm. Put 1 kilogram of weights on the weighting tray and display 10 Newtons correspondingly; 2 kilograms show 20 Newtons....
For structural reasons, if the arm length is enlarged or reduced to a certain magnification, the display value should also be enlarged or reduced to the same magnification.
The specific operation is as follows:
1. Install static calibration tools: calibration arm and hanging basket; 2、For digital calibration of instrument, please read EMC900 instruction for calibration operation. 3、Remove the calibration tool at the end of calibration. 4、EMC900 controller must be restarted until the end of 100 seconds countdown.
八、Use of dynamometer
1、Before boot

(1) Loosen the bolt of the sensor protection device to make the stator free.

(2) Check the connection between coupling and spindle.

(3) Check the coaxiality of the power machine and dynamometer.

(4) Check the connection and circulation of the inlet and outlet pipe systems.

(5) Clean the appearance, add lubricating oil to each lubrication point, and rotate the spindle to check whether the rotor and other components have collision and rotation inflexibility.

(6) The calibration meets the requirements.

(7) Fully open drainage butterfly valve (minimum load position).

2. Start-up test

(1) Start the power machine to drive the dynamometer spindle to rotate at the same speed. After the power machine is running normally, the test can be carried out.

(2) Fully open the intake valve and adjust the opening of the drainage butterfly valve until it is consistent with the working condition of the power engine.

(3) Four control modes, namely, constant position, constant torque, square torque and constant speed, can be selected to control the electronic control cabinet matched with dynamometer in the test of engine external characteristics, speed regulation characteristics, load characteristics and other characteristics.

(4) For some engines, sometimes the water supply pressure of a fixed dynamometer can not meet the test requirements of all working conditions, which can adjust the water supply pressure properly under different test conditions.

3. End of the experiment

(1) Close the intake valve.

(2) Fully open drainage valve.

(3) The engine runs at low speed for several minutes and then stops.

(4) Rotary sensor protection device, so that the stator is locked, the sensor is not forced.

(5) Cut off the power supply connected with the electronic control cabinet.

(6) Stop lubricating system oil supply.

(7) If the test is not done for a long time, the bottom drain valve of dynamometer should be opened to remove the accumulated water. If conditions permit, the upper end of the shell screw (except YP1900) can be unscrewed and the accumulated water can be purged with compressed air. The position of the screw is shown in Fig. 3 (a), (b).

In order to prevent bearing from entering water, please remember!!! The principle of "first start, then drain; first shut down, then shut down". To ensure that the dynamometer in the rotating state of water, but also should prevent the dynamometer in the anhydrous state of continuous operation for too long and burnt the sealing parts. (Require anhydrous working time is not more than 2 minutes.)

【Refresh】【Favorites】【Print】 【Close】
Previous:Two box temperature shock test chamber Next:YPS type unidirectional hydraulic dynamometer
久草婷妨| www.99热这里精品| 日韩aⅴ视频| 在线观看亚洲视频影院| 天天天天做夜夜夜夜做| 色色色干| 成人在线99| 丁香六月天AV| 色播五月天激情| 深爱丁香激情| 97大香蕉五月天| 婷婷中文字幕| 色婷婷www| 99色色热热| 九九伦子片| 另类图片婷婷五月天| 怡红院成人AV| 久热一区| 天天情色五月天| 亚洲旡码| 五月天天丁香婷婷| 99热这里只有精品22| 91精品久久久久久久| 五月婷婷六月激情| 国产成人精品亚洲线观看| 情欲禁地| 五月丁香色| 这里只有视频精品| 色欲九区| 五月丁香视频色色| 99视频在线播放大全| 热99只有精品| 五月丁香六月久久| 九九热99熟女| 激情五月天婷婷| 五月婷婷丁香瑟瑟视频| 综合激情网| 99碰超| 色99无码| 久久激情四射| 久久综合五月情| 国产成人精品一区二三区熟女在线| 婷婷五月天狠狠色| 深爱1激情网| 狠狠色综合777| 激情五月天福利| 久草婷婷| 精品亚洲国产成AV人片传媒| WWW.99热| 中文字幕成人| 狠狠色婷婷777| 五月婷婷中文| 99热无码| 日日肏夜夜干| 五月天欧美 另类小说| 九九综合| 色色色色色色色色五月先| 综合精品99| 五月四色激情| 精品一二三区久久AAA片| 中文字幕在线免费观看视频| 婷婷色网站| 大香蕉婷婷久久| 日本五月婷| 五月天婷婷永久免费视频| 亚洲天堂AV免费片| 五月天色色激情综合| 91网站黄| www.99热| http:色情日本com| 九九这里有精品| 中字幕视频在线永久在线观看免费 | 婷婷放心五日爱| 97在线碰| 日本精品99网站| 六月婷婷久久| 色色色综合| 丁香午夜天| 新97人人上人人| 亚洲网视屏| 色九月婷婷综合| 大香蕉伊人爱在线| 婷婷丁香九月| 久久综合丁香| 91欧美| 亭亭五月色男人| 久热91| 丁香婷婷深情五月亚洲| 欧美啪啪9| 91色逼| 综合激情在线| 一区二区成人电影| 久久99久久99精品免视看婷婷| 婷婷涩五月| 爽极品色| 国产成人网站在线观看| 日韩九九| 国产人妻人伦精品一区二区| 人与禽A片啪啪| 青青久在线视频免费观看| 91久热| 五月激情四射网站| 99少妇精品| 激情久久综合网| 丁香五月婷婷偷拍| 玖玖在线视| 亚洲综合视频在线| 亚洲五月天第一综合干| 天天操天天爽天天爱| 五月婷婷免费在线观看| 99亚洲精品视频| 开心五月天激情网| 激情内射p| 久色婷婷200| 国产乱妇乱子在线播视频播放网站| 干一干xxxx| 色婷婷久久久| 婷婷成人五月天| 成人免费120分钟啪啪| 免费看欧美成人A片无码| 777精品久无码人妻蜜桃| AA片在线观看视频在线播放 | 色婷婷AV久久久久久久| 性爱视频久久| 这里只有精品免费视频| 日韩限制级大尺度黑料泄密大尺度视频一区二区在线观看 | 丁香婷婷六月| 久久婷婷五月天激情| 夜夜谢天天干| 乱岳熟女50岁| 五月天婷婷涩涩| 日本色色影院| 国产熟女一区二区三区五月婷| 99热国内精品| 五月丁香狠狠爱婷婷综合| 婷婷开心深爱五月天| 成人婷婷五月天| 婷婷五月天另类网站| 夜夜撸.com| 日日操日日撸| 无套进入内谢11P视频A片| 91色噜噜狠狠狠狠色综合| 婷婷成人视频| 九九超日本| 久久久久久久久久91| 草综合网| 色五月婷激情| 99热久草| 婷婷五月色| 男人的天堂99| 爆乳熟妇一区二区三区爆乳照片| 国产淫熟妇| 久久人妻视步| 婷婷五月丁香综合激情| 日韩成人不卡| 精品99视频| 久热这里这里有精品| 亚洲最大五月天成人网| 激情五月天婷婷| 99热6精品| 丰滿爆乳一区二区三区| 九九aV| 99热这里有精品24| 色婷久九| 综合色色五月| 色婷婷中文在线| 丁香五月性| 亚洲婷婷成人五月天| 色婷六月| 婷婷亚州综合| 五月激情丁香五月| 97婷婷五月天| 亚洲丁香花色| 色婷婷成人久久| 4399高清无码视频| 天天激情夜夜干| 爽tv | 婷婷视频在线| 激情五月天色色| 色五月视频,小说| 开心五月色婷婷综合开心网| 丁香久久久| 国产精品色色| 99自拍视频在线| 丁香五月无码| 天天色天天| 五月天婷婷涩涩| 狠狠搞五月天| 婷婷五月天小说网| A片试看120分钟做受图片| 丁香花成人区| 可以直接看的av网站| www.婷婷.com| 婷婷丁香五月在线观看91| 五月天婷婷色| 99色在线| 综合在线观看99| 玖玖资源站国产| 丁香五月婷婷五月天| 五月综合激情| 久久久WWW| 五月成人天| 五月天偷拍| 婷婷大乡焦噜噜| 99久久思思| 99热在线精品观看| 色v综合网| 婷婷婷婷婷婷婷五月丁香| 日韩精品无码一区二区| 婷婷色激情网| 丁香五月激情网| 七七色综合| 狠色狠色狠狠色综合网| 丁香五月综合激情啪啪| 婷婷六月久久| WWW.开心五月天.COM| 九九99精品视频在线观看| 国产第99页| wwwxxx五月婷婷小说| 亚洲黄色影视| www.maotanji.com| 色播五月天激情| 爱穴久久| 婷婷五月天成人动漫 | 丁香婷婷综合激情五月色,开心五月丁香花综合网,激情综合五月亚洲婷婷,五月天 | 棕合影院色色| 丰满少妇熟乱XXXXX视频| 伊人九九68| 欧美综合婷婷网| 六月丁香激情网| 丁香五月婷婷色情综合| 成全二人免费| 五月婷婷国产| 天天激情站| 丁香五月综合网| 日本久久9| 久色国产| 激情性爱五月天网页| 日韩一66精品| 丁香六月激情综合| 婷婷激情小说网| 久久久久亚洲AV无码网影音先锋| 182TV大香蕉| 亚洲天堂aaaa| 97碰 在线视频观看| 婷婷五月开心中文字幕色| 67194国产| 97人人操人人操人人操人人| 丁香六月婷婷激情| 99啪在线| 色99在线| 午夜九九九九九九九九九九九九九| 丁香五月综合AV在线| 操逼电影免费看| 激情综合色五月丁香六月亚洲| 天天肏视频| 青青草色在线视频观看| 色五月色图| 色婷婷AV在线| 激情av在线| 天天操婷婷| 成人网站免费在线播放| 另类视频综合| 91精品久久久久久久| 中文字幕不卡+婷婷五月| 成人在线综合| 久久99久久99久久99人受| 91玖玖| 超碰91在线| 五月丁香999| 无码se| 五月天婷婷久久视频| 青青草性爱视频| 欧美va视频| 91蜜桃婷婷狠狠久久综合9色| 香蕉婷婷| 五月婷婷综合激情| 色五月婷婷7777| 丁香5月婷婷| 大鸡巴伊人网| 成人丁香| 日韩在线视频中文字幕| 五月丁香婷婷综合网| 99re久久| www.夜夜操| 春色激情第四色| 婷婷亚洲在线| 亚洲va在线∨a天堂va欧美va| 色99婷婷五月天| 国语精品探花| 久草丁香婷婷五月天婷| 激情亭亭五月| 26uuu视频欧美| 国产婷婷色综合AV蜜臀AV| 五月婷婷五月天天| AV免费在线网站| 99色精品| 天天肏夜夜肏| 丁香六月婷婷| 五月亭亭网成人在线视频| 91九色熟女| 久9热视频| 久久视网36| 狠狠色色| 天天影视天天爽天天草| 丁香五月婷婷黑人妻黄色电影院| 国产婷婷色综合AV蜜臀AV | 思思热在线视频99| 九月久久婷婷| 99热最新| 五月六月激情| 丁香五月激情啪| 亚洲第一成人无码A片| 99九九视屏| 色婷婷女优有码五月亭| 91久热| 五月天婷婷色小说| 在线观看亚洲AV| 五月丁香色情| 五月天深爱激情网| 成人视屏在线观看| 久草丁香婷婷1024| 蜜臀av粉嫩av懂色av| 梁铮版《蜘蛛女侠》在线| 色欲AVV| 激情婷婷五月天在线观看| 天天网曰日曰夜夜综合永久免费| 色婷婷成人| 狠狠大香婷婷爱| 六月丁香综合| 婷婷丁香综合成人| 婷婷伊人綜合中文字幕| 99精品偷自拍| 99视频在线精品| 久草五月| 开心久久网婷婷| yellow视频在线观看91| 天天干肏夜夜| 91ncm视频| 欧美槡BBBB槡BBB少妇| 六月丁香社区| 超碰只有精品在线| 婷婷九九| 丁香五月激情综合啪啪| 亚洲中文字幕AV| 五月J香蕉婷婷| 国自产拍在线网站| 久久久精久人妻| 色月九九| 五月天丁香啪啪网| aaa久久| 开心五月婷婷激情网| 亚洲激情四射色| 中文字幕AV网址| 久久96热| 婷婷色色五月天| 色婷婷av综合网| 九九碰九九爱97超碰| 婷婷激情综合无月| 婷婷色五月开心五月| 久99| 粉嫩av懂色av蜜臀av熟妇| 婷婷五亚洲| 精品综合爱| 婷婷黄色| 五月天久久婷婷| 色播丁香五月婷婷操:屄| 99精品偷拍视频| 亚洲五月婷婷| 五月婷色丁香| 久久久久久久久久久97| 日韩色色色色色| 人人干人人看| 亚洲看av的网站| www.五月婷婷久久.com| 色播色丁香五月| 欧洲色| 婷婷色综合| 天天操,天天插| 99热e| 色婷婷av综合网| 婷婷五月天激情文学| 五月天天天色| 婷婷开心综合人妻小说网址| 成人五月天综合网| 欧美在线视频免费播放| 色婷婷色99国产综合精品| 亚洲Av入口| 久久五月婷婷电影| 久草性爱| 久久婷婷草| 色九四色| 天天操综合网| 99激情在线| 欧美色播综合在线观看| 婷婷视频网| 日日操夜夜操中国无码| 9999久久久久| 亚洲精品久久久无码| 六月婷婷综合| 色五月天丁香婷婷| 丁香综合婷婷五月天| 99久久免费精品| 日本特黄aaaaa| 91色久| 九九青草热| 久久国产一区二区三区| 深爱五月天| 五月丁香成人| 丁香五月婷婷亚洲色图| 五月婷婷黄色视频| 中文字幕不卡+婷婷五月| 2015WWW永久免费观看播放| www.丁香黄色五月天人与| 五月天播播| 亚洲aV写真天天综合网久久| 开心五月婷婷激情网| 久久人妻乱子伦| 99免费综合网| 色狠狠色| 国产色视频网站2| av五月天婷婷丁香| 五月天久久小说| 婷婷综合中文| 成人精品一区日本无码网| 日日天天干| 色五月综合激情| 武则天精品久久| 五月婷av| 丁香五月六月综合欧美| 狠狠干在线| 啪啪小说五月天| 婷婷五月天黄色小说| 66精品成人免费网站在线观看| 五月天久久成人| 狠狠色狠狠色综合日日91| 激情综合亚洲| 九九热精品视频在线观看| 99久在线精品99re5热视频| 激情婷婷五月丁香啪啪啪| 亚洲激情网| 丁香五月婷婷综合激情啪啪啪| 亚洲亚洲人成综合网络| 国成人网| 九色PORNY9l原创自拍| 亚洲亚洲人成综合网络| 亚洲丁香五月天视频| 婷婷九月丁香| 五月天天综合| 九九热视频精品| 国产又色又爽又黄又免费| 亚洲精品字幕在线观看| 狠狠一日| 久操97| 超碰9| 噜一噜免费视频| 五月丁香婷婷综合激情基地| 热99视频| 99热精品在这里| 亚洲啪啪网| 国产丝袜美女| 99热在线精品观看| av在线婷婷| 最新日韩久热免费视频看看| 99热9999| 五月婷婷就去色| 六月丁香成人网| 五月丁香六月婷婷成人电影| 色婷婷88| 亚洲精品又粗又大又爽A片| 亚洲乱码日产精品BD| 精品九九久久| 久久久91| er99免费视频在线| 色婷婷亚洲婷婷| 99色在线观看| 夂夂夂夂夂夂夂夂夂夂夂夂夂夂夂夂夂夂夂亚洲亚洲亚洲亚洲亚洲亚洲亚洲亚洲色 | 婷婷五月天久久综合88| 99自拍视频网站| www.狠狠操.con| 狠狠狠狠狠草| 激情五月婷黄版| 粉嫩AV久久一区二区三区| 影音先锋男人AV资源站| 超碰色综合| 五月天婷婷激情小说| 26UUU欧美| 91色色色| 操逼电影免费看| 婷婷九色| \\五月天婷婷激情| 天天综合精品| 狠狠综合| 91日日日| 手机看片日日做夜夜| 五月丁香六月激情综合欧美| 9月色婷婷| 激情AV| 欧美日韩国产伦精品日韩人妻一| 人妻性爱| 色五月色五天免费视频| 五月综合激情网| 黄色成人AV在线| 性爱五月婷婷| 婷婷久久五月| 天天日夜夜拍| 亚洲欧洲中文日韩久久AV乱码| 亚洲三级无码| 99久久久免费| 婷婷王月天影院| 黄色AV日韩| 婷婷情色五月| 国在线激情网| 色婷婷五月天在线观看| 99色在线视频| 久久久91| 五月婷婷 激情五月| 婷婷五月色激情欧美激情| 福利视频在线播放| 天堂久久精品| 99精色| 疯狂做受XXXX高潮A片| 狠狠色噜噜狠狠| 少妇久久诱惑视频| caop在线视频| av在线不卡播放| 久久久久久xxxxx| 色噜噜狠狠色综合日日| 97夫妻超碰| 伊人激情综合网| 丁香六月无码| 在线观看免费视频| 丁香九月激情| 99热色精品| 婷婷成人基地| 大香蕉婷婷| 人人摸人人| 婷婷五月欧美综合| 婷婷丁香在线| 四月婷婷丁香五月| 婷婷五月丁香激情| 黄色大片又大粗又爽| 天天草天天爽| 亭亭丁香97| 开心四月婷婷在线色播播| 任你爽精品免费视频6| 大香蕉久久久久久久久| 亚洲久久婷婷丁香五月天| 97人人操人人干| 丁香五月激情网| WWW五月| 色啦啦视频| 五月天婷婷综合久久| 少妇荡乳欲伦交换A片欧美| 欧美黄色一级| 99在线视频在线观看| 99福利导航| 天堂五月婷婷| 国产综合网在线| 九九爱激情| 免费日韩99| 婷婷激情五月| 97操在线视频| 九九99热久久精品66中文字幕| 国产肥白大熟妇BBBB视频| 婷婷五月天成人在线视频| 综合99久久天天综合| 99久免费视频| 日本性激情色播| 人妻熟女一区二区AV| 天堂婷婷五月在线| 五月丁香婷婷六月| 啪啪激情综合| 99热99美国在线观看| av婷婷丁香| 婷婷色情小说| 久99婷婷色综合| 五月天色综合服务平台| 国产午夜成人免费看片无遮挡| 亚洲综合字幕色色| 久久色情| 久久免费精品小视频| 婷婷色九月| 丁香婷婷五月激情| YJLZZJLZZ亚洲乱熟无码| 伊人婷婷大香蕉| 99ri精品在线| 久婷婷色| 色四房| 五月丁香黄色| 五月天婷婷影院| www九月婷婷| 夜夜夜夜夜骑撸| 一本久久婷婷| 日日操天天| 超碰成人影视| 26uuu欧美亚洲日韩| .精品久久久麻豆国产精品| 激情五月婷婷欧美极品 | 丁香五月天.com| 北京熟妇搡BBBB搡BBBB| 六月婷婷av| 久久新地址| 丁香五月天AV在线| 九九热在线99| 亚洲色婷婷五月天| 天天肏高清在线| 五月婷在线影院| 五月天激情久久| 婷婷爱在线观看| 99操| 丁香婷婷六月激情| 射满了还射免费在线观看 -午夜版全集-新视觉影院| 国产五月丁香在线| 野战J办公桌椅H| 我要射综合| 色吊丝99| 五月开心播播网| 日韩不卡DvD| 超碰99在线| 亚洲婷婷开心五月| 亚洲AV久久久久久久久久久久久久久久| 武汉美女啪啪视频免费一级片| 丁香六月综合| 五月婷婷激情中文字幕| 亚洲AV综合网| 99热免费| 日韩综合大黄| 爆乳熟女-区二区三区| 99成人| AV堂狠狠干| 伊人99热| 五月成人天| 狠狠五月激情丁香六月| 色播五月婷婷| 丁香五月婷婷天激情| 国内久久婷婷| 久久99热这里只有精品| 久热婷婷| 激情五月婷婷| 五月婷婷丁香瑟瑟视频| 国产精品人妻欲求不满| 少妇性BBB搡BBB爽爽爽电影| 超碰狠狠色| 五月天停停日日| 色狠狠综合| 99 频99热国里只有精品| 久久久久9久无码视频| 超碰v| 久久黄A片| 99在线精品免费视频| 九九免费精品| 婷婷五月丁香91| 丁香五月伊人| 另类激情五月天| 97欧美在线| 婷婷激情四射| 五月丁香六月婷婷在线播放| 久久五月天网| 久久久精品人妻| 五月丁香六月激情狠狠| 海外网站专业操老外| 91丨九色丨东北熟女| 五月天精品综合在线| 91九色大屁股| 欧美顶级少妇做爰HD| 色情五月婷婷| 888精品福利地址| 超级久久久| 91丨九色丨大屁股| 婷婷激情丁香六月| 99碰碰。| 九色自拍| 日本AAAAAAAAAAAAAA片| 丁香六月狠狠干| 婷婷综合视频| 思思精品热在线| 丁香五月激情啪| 伊人在线视频| 亚洲精品视频电影| 五月婷婷免费在线观看| 九月av在线| 99热色精品| 婷婷色五月在线视频| 日本美女上人| 97人人操人人插| 综合色情网| 五月天色综合服务平台| 五月丁香六月婷婷成人| 人人艹艹艹| 色四房| 婷婷九月丁香久久| 五月大香蕉| 亚洲第一成人AV| 国产精品国产成人国产三级| 婷婷五月丁香在线观看| 99九九在线精品热动漫| 亚洲182在线观看| 色欲色香综合网| 久久小片| 91艹人| 婷婷情色五月天| 国产乱子轮XXX农村| 97色色视频| 四色女婷婷| 九九Y精品热播| 国产精品日本一区二区在线播放| 婷婷天天日婷婷| 2025最新亚洲激情在线| 久久婷丁香五月| 九九色插| 成人做爰高潮A片免费视频| 免费观看的av| 五月精品免费XXX| 久久黄A片| 超碰在线资源| 河北真实伦对白精彩脏话| 免费观看18视频网站| 婷婷情色激情| henhencao国产在线| 色色色色色五月| 综合欧美五月婷婷| www99热| WWW.婷婷| 婷婷丁香五月天亚洲| 草综合网| 日韩免费99| 欧美天堂婷婷日韩| 91热视频色网站| 97婷婷五月天| 深爱五月婷婷开心中文字幕| 日本99在线| 免费观看日韩成人av| 96自拍视频九色在线观看| 国产午夜一区二区三区| 伊人午夜综合色啪| 色五月天综合| 五月婷婷激情综合在线| 亚洲99在线| 九九九九成人| 亚洲成AV人片在线观看| 风流少妇A片一区二区蜜桃| 激情综合五月| 天堂久久婷婷| 色五月激情五月开心五月| 婷婷激情啪啪| 五月五丁香婷婷| 视频综合网| 综合久久久婷| 久久99最新地址| 国产成人一区二区三区在线观看| 六月婷婷激情图片| 国产欧美日韩综合精品一区二区| 噜噜色com| 丁香5月婷婷| 久久一二三视频| 五月天婷婷在线啪啪视频| 99在线精品视频免费| 亚州美女| 国产精产国品一二三在观看| 老司机伊人| 婷婷涩五月| 亚洲V国产V欧美V久久久久久| 色中色综合| 五月婷婷 激情五月| 天天噜天天插| www.婷婷六月天| www.色9| 丁香五月欧美色综合| 国产精品成人网站| 色婷婷性爱| 丁香花狠狠婷婷亚洲中文字幕| 丁香五月天激情| 精品欧美一区二区三区久久久| 思思久久99| 爱久久小说下载网| 熟女少妇内射日韩亚洲| 色五月激情五月| 99热在线播放| 久热这里只有精品6| 人妻无码精品一区| 99热这里是精品| 久久色天堂| PORNY九色9l自拍视频成人| 天堂中文8资源在线8| 成全二人免费| 九九色综合网| 激情五月天色色| www婷婷| 麻豆WWWCOM内射软件| 婷婷激情五月| 中文字幕乱码亚洲精品一区| 亚洲愉拍99热成人精品| 欧美日本韩国亚洲| 97在线观视频免费观看| 国产一级片| 欧美性做爰大片免费看办公室| 国产99久久久国产精品免费看| 激情五月天婷婷丁香| 国产美女无遮挡裸体毛片A片| 五月天另类视频| 99精品偷自拍| 成人草榴视频| 婷婷干| 九九热在线精品视频| 五月天国产| 99愛国产| 五月天婷婷伊人| 啪啪啪五月天| 色色色色色网站| 狠狠干狠狠干| 激情综合网五月激情网| 婷婷五月天小说| 99精品视频免费观看| 天天爽天天| 五月婷婷影院| 亚洲爆乳无码精品AAA片蜜桃| 日本人人超碰| 丁香激情五月| 亚洲殴洲精品Av在线| 久久综合五月情| 婷婷娌伦网| 伊人大香蕉综合在线| 免费人人操| 婷婷婷久久久| 婷婷色影院| 精品无码色欲AV| 99久久免费精品| 色135综合网| 欧美色色色| 懂色av粉嫩av蜜臀av| 亚州精品成人片| 丁香五月六月综合激情| 亚洲操B视频| 久久黄A片| 色五月激情问网站| 开心五月天激情| 国产欧美va| 西西女色窝窝7777777| 99久热这里只有精品| 色一色综合| 久久婷婷丁香视频网| 亚洲色涩视频| 777丁香六月青青草婷婷综合久月| 亚洲第一色色色| 丁香婷婷色情社区成人小说| WWW.99视频| 成人无码精品1区2区3区免费看| 97人碰人操| 大香婷婷| 久久色在线视频| 午夜婷婷五月天| 激情小说视频图片网| 色婷婷成人网| 激情网 久久| www.97碰碰com| 激情综合网之激情五月| 99成人无码| 67194中文字幕| 裸体做A爰片毛片A片免费| 五月丁香综合色婷婷| 婷婷丁香91| 六月婷婷狠狠| 天天骑天天操| 91超碰在线播放| 婷婷丁香五月天综合在线日韩| 先锋资源91| 色色网站免费观看| 天堂网啪啪| 五月天久久婷| 五月天成人综合| WWW·天天操·视频?| 五月婷婷欧美激情| 久久xx| 激情丁香五月| 99热高清在线| 久久激情综合| 丁香花五月| W色综合| www超碰| 视色综合| 色色日本| 毛片新网地| 欧美综合五月丁香六月婷| 中国丰满熟女A片免费观| http:色情日本com| 亚洲综合另类| 五月婷在线视频免费播放| 久久久WWW| 五月婷视频在线观看| 亚洲99激情| 91丁香五月| 亚洲中字AV电影在线网站| 日本精品在线噜噜噜| 激情五月天激情五月天| 另类视频在线| 欧美天堂久久| 99热在线这里只有精品| 超碰二区| 91人无码久久久久久| 亚洲va日| 四LLLBBBB槡BBBB| 91美女啪啪| 亚洲在线激情婷婷五月| 少妇的肉体AA片免费| 黃色三级三级三级三级 qixing300.shrkbk.com www.jinbozs.com tianmiaosw.com | 99免费热视频在线| 婷婷丁香在线播放| 日日操夜夜擼| 成人五月天在线观看| 丁香五月婷婷av| 九九综合网| 亚洲激情区| 精品人妻久久久久久| 九九久久五月天综合伊人| WWW五月天| 99在线观看视频| 麻豆精品| 五月色丁香激情| 99色在线观看| 俺也去婷婷五月天第五色| www.久久久久久久| 婷婷五月天中文字幕| 涩涩涩五月天| 九九婷婷激情综合网| 婷婷六月丁香激情综合| 五月激情综合网| 超碰com| 成人视频婷婷| 五月天另类小说久久小说网| 色五月婷婷少妇人妻| 99热.com| 欧美性生交XXXXX无码小说| 九九色热| 激情四射婷婷| 人人操婷婷| 大地资源色婷婷视频在线| 丁香五月激情综合| 日本久久综合| 色婷婷88| 操久久网| 婷婷五月激情中文字幕| 久草视频大香蕉99| 97精品欧美91久久久久久久| 伊人久久五月天综合| 婷婷色综合| 亚洲综合五月天综合| 九九热精品视频| 婷婷激情伍月网| 国产免费AV在线| 五月婷婷日| 丁香婷婷月| 大香蕉人人网| 五月综合色播播丁香婷婷| 8090在线影视少妇| 久久只有精品| 青青草激情网| 激情五月天婷婷图| WWW.99热| 五月婷久久久久综合| 国产成人va在线| 丁香五月婷婷啪啪| wuyuedingxiang99| 久久婷五月天| 激情人妻综合| 色天堂在线| 五月婷精品| 国产精品电影网| 丁香五月婷婷激情网| 丁香五月成人社区| 色综合99色| 九九热九九| 欧美色99| 六月丁香啪啪| 久久92| 日本色图综合| 99免费热视频在线| 婷婷综合色| 激情啪啪五月| 日本色99| 激情综合网,五月| 午夜少妇在线观看视频| 婷婷综合网伊人| 狠狠色婷婷7777久| 色婷五月| 日操夜操天天操不卡| 伊人色综在线| 五月色亭丁香| 激情五月综合| 98色丁香五月婷婷综合网| 激情五月丁香亭亭| 超碰爱爱爱| 精品色色| 超级碰碰碰碰视频| 日日夜夜天天| 久色五月天| 120分钟婬片免费看| 狠狠色丁香婷婷五月| www.夜夜撸.com| 九九九九无码| 婷婷婷婷婷婷婷婷| 在线观看的av| 五月天婷婷在线播放| Xx色综合| 丁香网五月天| 丁香婷婷视频在线| 丁香激情五月| www.婷婷.com| 99自拍视频网站| 啊v视频在线观看| 六月色日韩| 国内一级片| 97婷婷丁香五月| 一区二区三区四日本| 六月婷婷久久大全| 黄色毛片精品| 最新久久网址| 欧美激情五月综合| 国产成人网站在线观看| 激情图片久久| 九九99免费理论| 五月天激情小说婷婷| 色色色9| 狠狠干五月丁香| 玖玖91| 五月丁香六月情| 婷婷六月啪啪| 天天日日夜夜| 热久久视频99| 久色激情| 性爱视频99| 欧美成人网婷婷综合在线| 1024人妻| 激情噜噜噜| 免费黄色视频网址| 五月天激情小说| 五月丁香综合激情| 91色久| 黄色片avv| 国产精品天天狠天天看| 九色PORNY9l原创自拍| 国产婷婷色综合AV蜜臀AV| 五月婷婷婷自由综合| 五月婷婷久久久久| 久久小说| 99re视频精品| 91色在线| 99热97| 天天操,夜夜骑| 狠狠色婷| 日本色色网站| 久久婷婷成人视频| 五月婷婷综合在线视频| 久久婷五月天| 婷婷激情啪啪| 亚洲色久| 色婷综合| 中文字幕 中文字幕明步| 五月婷婷在线视频免费观看| 五月丁香六月激情网站| 婷婷综合成人五月天| 久久人操-久草婷婷-成人AV| 色综合综合色| 激情婷婷色色| 久久久久久9热不雅视频| 人妻九九九九| 五月色网| 99热在线播放| 青青999| 国产亚洲精品AAAA片APP| 久久这里只| 婷婷激情五月天7| 女人被男人吃奶到高潮| 伊人久久丁香婷婷六月五月综合| 成人五月丁香社区| 草久私拍| 色就干| 欧洲亚洲激情五月天在线| 久久综合影院| 公的粗大挺进了我的密道| 丁香五月人妻| 色婷婷丁香五月观看| 久久久久亚洲AV无码网影音先锋| 狠狠综合| 婷婷亚洲综合| 色色性爱视频| 麻豆科斗777| 99在线资源| 婷婷五月丁香青青草在线| www99在线观看视频| ...婷婷国产成人亚洲日韩| 欧美伊人9| 五月天福利影院导航| 久久激情天堂| 日逼免费视频| 婷婷天堂综合| 免费碰碰视频久| 亚洲av成人在线| 99免费在线| 99热6这里只有精品6| 超碰在线中文字幕| 欧美性爱专区| 婷婷五月色综合| 日韩精品电影| 99亚洲视频| 第四色婷婷最爱| 激情婷婷丁香五月天| 狠狠色色色| 人人播| 婷婷五月天国产| 丁香婷婷五月天色播| 成人一级片| 九九色情网五月天| 色色亚洲| 丁香婷婷基地| 天天综合久久| 日本在线va| 成人婷婷五月天| 99视频这里只有免费精品| 91碰碰视频| 97人人操com| 大香网伊人久久综合| 激情五月天啪啪| 精品,99| 免费久久这里只有精品99| 91Chinese在线| 五月丁香综合在线| 亚洲一区二区色图-亚洲精品国产精品乱码-成人AV | 色99热| 久久五月天激情美女| 丁香五月大香蕉AV| 久热99久热| 亚洲精品一区无码A片| 婷婷五月天成人网| 91婷婷色五月| 97色色色| 色小说五月婷婷| 一本久久亚洲五月婷婷| 色亚洲无码| 亚洲操逼网| 激情亚洲婷婷| 婷婷五月丁香香蕉| 色五月丁香五| 丰满少妇猛烈A片免费看观看| 久热这里只有精品6| 欧美综合123区| 激情五月天开心| 五月天久久婷婷| 在线国产精品色| 97操碰日本女人| 在线成人va| 伊人99热| 五月天综合在线| 嫩草AV久久伊人妇女超级A| 色色激情五月天| 色播开心网| 五月六月伦理| 久久激情五月| 天天弄| 亚洲无码色|